• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:18来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (d)  
Measure the distance from the forward end of the valve actuator body to the centerline of the actuator rod end bearing.

 (e)  
Make sure that the measurement is 3.55 (|0.15) inches.

 (f)  
Do the five steps just before this step again if the measurement is not in the limits of the tolerance.


 S 434-030
 (4)  
Install a lockwire to the jamnuts (Ref 20-11-28/401).

 S 434-031

 (5)
Connect the wires to the terminals 1 and 3 on the limit switch.

 S 434-048

 (6)  
Apply a layer of sealant, BMS5-95, to the mating surfaces of the wires and the limit switch.


 G. Functional Check of the Ram Air Exit Door Limit Switch
 S 864-033
 (1)  Open these circuit breakers on P6 Main Power Distribution panel and attach DO-NOT-CLOSE tags:
 (a)  
6F35 PACK TEMP CONT A

 (b)  
6F36 PACK TEMP CONT B


 S 024-034
 (2)  Disconnect the electrical connector from the actuator of the ram air exit door for the applicable pack (1, 2 or 3):
 (a)  DV156 for pack 1
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-62-12
 ALL  ú ú 01 Page 407 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (b) DV157 for pack 2
 (c) DV158 for pack 3.
 S 424-035
 (3)  Install short, low resistance, jumper wires from pins 1, 2 and 3 on
 the electrical connector (DV156, DV157, DV158) to pins 1, 2 and 3 on
 the actuator (V156, V157, V158), respectively.
 (a) DV156 and V156 for pack 1
 (b) DV157 and V157 for pack 2
 (c) DV158 and V158 for pack 3
 S 864-036
 (4)  Close this circuit breaker on the P6 Main Power Distribution panel:
 NOTE: After you close the circuit breaker listed below, CMC____
 messages will show and report the ram air exit door
 actuator(s) as failed. However, the CMC messages will clear
 after completion of this functional check and restoration of
 the airplane.
 (a) 6F35 PACK TEMP CONT A
 S 864-037
 (5)  Make sure on the EICAS ECS maintenance page that PTC CHANNEL IN CONT
 shows "A" for each pack, and an RAE POSITION indication shows for
 each pack ram air exit door.
 S 864-042
 (6)  Close the ram air exit door manually with the Allen wrench until
 there is continuity between the terminals 1 and 3 of the limit
 switch.
 S 864-040
 (7)  Make sure the RAE POSITION indication shows 0.85+/-0.03 on the EICAS
 ECS maintenance page.
 (a) If the RAE POSITION indication does not show 0.85+/-0.03, do
 the above steps to adjust the limit switch.
 S 864-045
 (8)  Open this circuit breaker on P6 Main Power Distribution panel and
 attach DO-NOT-CLOSE tag:
 (a) 6F35 PACK TEMP CONT A
 S 024-043
 (9)  Remove the jumper wires from the electrical connector and the
 actuator.
 S 424-044

 (10) Connect the electrical connector to the actuator of the ram air exit door for the applicable pack (1, 2 or 3):
 (a) DV156 for pack 1
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-62-12
 ALL  ú ú 01 Page 408 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (b)  
DV157 for pack 2

 (c)  
DV158 for pack 3.


 H. Put the Airplane Back to Its Usual Condition
 S 864-024
 (1) Remove the DO-NOT-CLOSE tags and close these circuit breakers:
 (a)  
P415 Power Distribution Center - Right
 1) 415C38 PACK TEMP CONT B
 2) 415K27 PACK TEMP CONT A


 (b)  
P180 DC Power Distribution Panel
 1) 180J2 PACK 1 PROT
 2) 180F2 PACK 2 PROT
 3) 180J17 PACK 3 PROT


 (c)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(187)