• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:18来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

G1  GS13237-1  P1  AD30008-3 
G2  GS13238-1  P2  AD30008-1 
FLOW CONTROL AND SHUTOFF VALVE TEST SET CONNECTIONS 

Flow Control and Shutoff Valve Test Ports
Figure 501

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-01
 ALL  ú ú 01 Page 502 ú Oct 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 865-003
 (2)  Open the applicable (PACK 1, PACK 2, or PACK 3) circuit breakers, on the DC power distribution panel, P180.
 (a)  
180J1, PACK 1 FLOW CONT VLV

 (b)  
180J2, PACK 1 PROT

 (c)  
180F1, PACK 2 FLOW CONT VLV

 (d)  
180F2, PACK 2 PROT

 (e)  
180J16, PACK 3 FLOW CONT VLV

 (f)  
180J17, PACK 3 PROT


 S 015-027
 (3)  Open the applicable access door (AMM 06-09-03/201):
 (a)  
191H-L for pack 1

 (b)  
191N-L for pack 2

 (c)  
192H-R for pack 3


 S 485-029
 (4)  Connect the test equipment
 (a)  
Disconnect the electrical connector from the valve.

 (b)  
Remove the plug and the filter from the valve test port G1.

 (c)  
Install the GS13237-1 plug in the valve test port G1.

 (d)  
Cut and remove the lockwire from the plug in the valve test port G2 (AMM 20-11-28/401).

 (e)  
Remove the plug from the valve test port G2.

 (f)  
Install the GS13238-1 plug in the valve test port G2.

 (g)  
Use the hose assembly AD30008-3 to connect the valve test port G1 to the tester connector P1.

 (h)  
Use the hose assembly AD30008-1 to connect the valve test port G2 to the tester connector P2.

 (i)  
Use the cable assembly GS8967-1 to connect the 28V DC tester connector to the valve electrical connector.

 (j)  
Use the cable assembly GS8967-9 to connect the tester TEST receptacle to the valve electrical receptacle.

 (k)  
Make sure the 0-30, 0-100, and 0-160 psi gage valves, on the tester, are open.


 S 865-010
 (5)  
Supply electrical power (AMM 24-22-00/201).

 S 865-011

 (6)  
Close the applicable (PACK 1, PACK 2, or PACK 3) circuit breakers, on the P180 panel.

 (a)  
180J1, PACK 1 FLOW CONT VLV

 (b)  
180J2, PACK 1 PROT

 (c)  
180F1, PACK 2 FLOW CONT VLV

 (d)  
180F2, PACK 2 PROT

 (e)  
180J16, PACK 3 FLOW CONT VLV

 (f)  
180J17, PACK 3 PROT

 


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 21-51-01
 ALL  ú ú 02 Page 503 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 S 485-012
 (7)  
Connect the air or the nitrogen supply to the air inlet port of the tester.

 S 865-013

 (8)  
Close the power switch on the tester.


 (a)  Make sure the POWER light and the VALVE CLOSED light, on the tester, come on.
 E. Do the Flow Control and Shutoff Valve Test
 S 725-014
 (1)  Do the test for the Actuator Operation and Closed Position Limit Switch
 (a)  
Set the pressure selector to the A position.

 (b)  
Pull the knob S1 to the open position.

 (c)  
Put the toggle switch S2 to the open position.

 (d)  
Turn the 0-100 psi pressure regulator knob clockwise until the 0-100 psi gage reads 14 psi.

 (e)  
Make sure the flow control valve opens.

 (f)  
Make sure the VALVE CLOSED light, on the tester, goes off.


 S 725-015
 (2)  Do the Test for the Flow Control Schedule
 (a)  
Turn the 0-30 psi pressure regulator knob until the 0-30 psi gage reads 2 psi.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 空调 AIR CONDITIONING 2(8)