• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:53来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 024-013

 (6)  
Remove the valve.


 TASK 32-43-26-404-014
 3. Autobrake Shuttle Valve Installation (Fig. 401)
____________________________________
 A. References
 (1)  
32-41-00/201, Hydraulic Braking System

 (2)  
32-43-01/501, Automatic Braking System

 B.
Access

 (1)  
Location Zone
 216 Left Main Wheel Well
 217 Right Main Wheel Well


 C.
Procedure


 S 424-015
 (1)  
Put the valve assembly in its position on the bracket and install bolts at the three attach points.

 S 424-016

 (2)  
Lubricate the packing with clean hydraulic fluid and install the packing and the unions.

 S 434-017

 (3)  
Connect the hydraulic lines to the valve.

 S 434-018

 (4)
Connect the electrical connector to the switch on the valve.

 S 874-019

 (5)  
Bleed the hydraulic system to the antiskid valves
 (Ref 32-41-00/201).


 S 794-020

 (6)  
Do a check for leaks at the hydraulic fittings of the shuttle valves.

 (7)
Do a test on the automatic braking system (Ref 32-43-01/501).


 S 724-021
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-43-26
 ALL  ú ú 01 Page 402 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
FLOW FLOW
FUSE FUSE
OVERHEAD

AUTOBRAKE CONTROL MODULEACCUMULATOR ALT BRAKE
ISOLATION SELECTOR VALVE
VALVE
ANTISKID ANTISKID SHUTTLE BRAKE METERING SHUTTLE VALVES VALVE ASSY VALVES
(2 PLACES)RIGHT
LEFT ALTERNATE
LEFT
ALTERNATE PARKING BRAKE
ANTISKID
ANTISKID ANTISKID SHUTOFF VALVE
OUTBD CONTROLCONTROL
CONTROL VALVE
INBD VALVES VALVEAUTOBRAKE
SHUTTLEBRAKE
BRAKE FLOW
VALVES
FLOW FUSES
SEE A FUSES
WHEEL WELLINBD RIGHT ANTISKID AFT BULKHEADCONTROL VALVESOUTBDSTA 727
SERVICING GAGE
ACCUMULATOR

BRAKE PRESS
TRANSMITTER

BL 0
VIEW LOOKING AFT
ELECTRICAL 
CONNECTORS  VALVE  HYDRAULIC 
FITTINGS 
MOUNTING  PRESSURE 
BOLTS  SWITCH 
PRESSURE 
SWITCH 
VALVE 
HYDRAULIC  UP 
WHEEL WELL  FITTINGS 
AFT BULKHEAD 

Autobrake Shuttle Valve Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-43-26
 ALL  ú ú 01 Page 403 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 AUTOBRAKE PRESSURE CONTROL MODULE - MAINTENANCE PRACTICES
_________________________________________________________
 1.  General
 A.  The procedures that follow remove and install these components of the autobrake pressure control module:
 (1)  
Filter

 (2)  
Solenoid Shutoff Valve

 (3)  
Servo Valve

 (4)  
Pressure Switch


 TASK 32-43-46-802-001
 2.  Prepare for the Removal_______________________
 A.  Standard Tools and Equipment
 (1)  
Chocks - Wheels

 B.  
References

 (1)  
24-22-00/201, Manual Control

 (2)  
32-00-01/201, Ground Locks

 C.  
Access

 (1)  
Location Zone
 102 Control Cabin - Right
 310 Left Main Landing Gear
 410 Right Main Landing Gear


 D.  
Procedure


 S 492-002
 (1)  
Make sure you install the ground locks in the main and nose landing gears (AMM 32-00-01/201).

 S 492-003

 (2)  
Put chocks at the wheels.

 S 842-004

 (3)  
Supply electrical power (AMM 24-22-00/201).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 3(83)