• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:53来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 864-003

 (2)  
Open all of the circuit breakers for the landing gear on the circuit breaker panel, P6-2, and attach DO-NOT-CLOSE tags.

 (3)  
Remove the pressure from the hydraulic system A (Ref 29-15-00/201).

 S 024-005

 (4)  
Do these steps to remove the position switch for the control lever (Fig. 401):

 (a)  
Release and lower the instrument panel for the first officer.

 (b)  
Remove the bolts that attach the switch support bracket to the control lever assembly.

 (c)  
Remove the bolts, washers, and nuts that attach the switch assembly to the switch support bracket.


 S 044-004
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-61-11
 ALL  ú ú 02 Page 401 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500
MAINTENANCE MANUAL

SEE  A 
SPACER 
POSITION 
SWITCH  A 
CONTROL 
LEVER 
ASSEMBLY 
SEE  B 
SWITCH 
SUPPORT 
A  BRACKET 
POSITION 
SWITCH  SWITCH  FWD 
ACTUATOR  ELECTRICAL CONNECTOR 
FOR THE CONTROL 
SWITCH  LEVER ASSEMBLY 
MOUNTING 
BOLTS  A 
FWD 
CONTROL  GUIDE 
LEVER 

0.06-0.12 INCH 
(1.52-3.04 mm) 

SWITCH 

LEVER
LOCK PLATE
1 ADJUST SWITCH TO ACTUATE
A-A
WITH LEVER (89) 0.06-0.12 INCH
(1.52-3.04 mm) FROM BOTTOM OF DETENT

Control Lever Position Switch Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-61-11
 ALL  ú ú 01.1 Page 402 ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (d)  
Put tags on the switch wires to help you connect the wires correctly during the installation.

 (e)  
Remove the switch wires at the switch terminals.

 (f)  
Remove the position switch from the switch assembly.


 TASK 32-61-11-404-006
 3.  Install the Control Lever Position Switch_________________________________________
 A. Special Tools and Equipment
 (1)  
Ground Locks - F72735 (Ref 32-00-01/201)

 B.
References

 (1)  
24-22-00/201, Manual Control

 (2)  
32-00-01/201, Ground Locks

 C.
Access

 (1)  
Location Zone
 102 Control Cabin - Right


 D.
Install the Position Switch


 S 864-013
 WARNING: MAKE SURE YOU INSTALL THE GROUND LOCKS ON THE NOSE AND MAIN
_______ LANDING GEAR BEFORE YOU MOVE THE CONTROL LEVER FOR THE LANDING GEAR. IF YOU MOVE THE CONTROL LEVER WITHOUT THE GROUND LOCKS INSTALLED, THE LANDING GEAR CAN RETRACT AND CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (1)  
Make sure the ground locks are installed on the nose and main landing gear (Ref 32-00-01/201).

 (2)  
Do these steps to install the position switch for the control lever:


 S 424-007
 CAUTION: YOU MUST TURN THE HEADS OF THE SWITCH INSTALLATION BOLTS
_______ INBOARD WHEN YOU INSTALL THEM. IF THE SWITCH BOLT HEADS DO NOT POINT INBOARD, THEY CAN GET CAUGHT IN THE LOCK MECHANISM FOR THE CONTROL LEVER.
 (a)
Assemble the position switch on the switch assembly.

 (b)
Connect the switch wires to the switch terminals.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-61-11
 ALL  ú ú 01 Page 403 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 3(155)