• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:53来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 844-004

 (3)
Put the chocks on the wheels and release the parking brake.

 S 844-005

 (4)  
Fully push the brake pedals until the brake accumulator gage does not show a pressure drop.

 S 034-006

 (5)  
Disconnect the hydraulic lines from the shuttle valve and the cap lines.

 S 024-007

 (6)  
Remove the unions from the ports of the valve, discard the O-rings and put the plugs on the ports.

 S 024-008

 (7)  
Remove the two bolts from the top of the shuttle valve to remove the shuttle valve from the mounting bracket.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-41-95
 ALL  ú ú 01 Page 401 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 TASK 32-41-95-404-042
 3. Install the Brake Shuttle Valve (Fig. 401)
_______________________________
 A. Consumable Materials
 (1)  
D00054 Lubricant - Hydraulic System Fitting, MCS 352

 (2)  
D00007 Fluid - Hydraulic, BMS 3-11

 B.
References

 (1)  
12-12-00/301, Hydraulic Reservoir

 (2)  
29-15-00/201, Hydraulic Systems

 C.
Access

 (1)  
Location Zone
 101 Left Control Cabin
 102 Right Control Cabin
 216 Left Main Wheel Well
 217 Right Main Wheel Well
 310 Left Main Landing Gear
 410 Right Main Landing Gear


 D.
Install the Brake Shuttle Valve


 S 164-010
 (1)  
Clean the shuttle valve and the mating surfaces of the mounting bracket.

 S 434-011

 (2)  
Attach the shuttle valve to the bracket with two mounting bolts.

 S 644-012

 (3)  
Lightly apply hydraulic fluid or lubricant to the unions and the O-rings.

 S 414-013

 (4)  
Install the unions in the valve ports.

 S 434-014

 (5)  
Install the new O-rings on the valve unions.

 S 434-015

 (6)  
Connect the hydraulic lines to the valve.

 E.
Bleed the Brake System from Antiskid Valves through the Brakes


 S 874-016
 (1)  
Remove the bleeder screw and the washer from the bleeder valve on the brake.

 (2)  
Connect a flexible hose to the bleeder valve.


 S 874-017
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-41-95
 ALL  ú ú 01 Page 402 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
OVERHEAD
FLOW FLOW BRAKE SHUTTLE LEFT OUTBOARD
FUSE  FUSE
RIGHT INBOARD AUTOBRAKE VALVE BRAKE SHUTTLE CONTROL
SEE A
VALVE  MODULE
ACCUMULATOR ALT BRAKE
ISOLATION
SEE A  SELECTOR VALVE
VALVE
BRAKE METERING VALVE ASSY (2 PLACES)
RIGHT  LEFT 
CONTROL ANTISKID ALTERNATE  SHUTOFF VALVE PARKING BRAKE  OUTBD  CONTROL ANTISKID LEFT  ALTERNATE CONTROL ANTISKID 
VALVE  AUTOBRAKE  INBD  VALVES  VALVE 
RIGHT OUTBOARD BRAKE SHUTTLE  BRAKE FUSES FLOW  VALVES SHUTTLE  BRAKE FUSES FLOW  LEFT INBOARD BRAKE SHUTTLE 
VALVE  INBD  RIGHT ANTISKID VALVE 
SEE  A  OUTBD  CONTROL VALVES  SEE  A 

ACCUMULATOR
SERVICING GAGE WHEEL WELL AFT
BRAKE PRESS TRANSMITTER BULKHEAD STA 727
BL 0
(VIEW IN THE AFT DIRECTION)
UNIONS BRAKE SHUTTLE VALVE
WASHERS
MOUNTING
BOLTS
UNIONS
FWD STRUCTURE
SHUTTLE VALVE INSTALLATION (RIGHT SHOWN, LEFT SIMILAR)
A
Brake Shuttle Valve Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 3(43)