S 034-007
(3)
Carefully pull the sensor wires out of the flexible conduit.
NOTE: Do not pull the free end of the pull-line out of the conduit.
____
(a)
Disconnect the pull-line from the sensor wires.
(4)
Remove the sensor from the airplane.
S 024-008
TASK 32-61-31-404-009
2. Install the Main Gear Downlock Sensor
_____________________________________
A. General
(1)
The procedure that follows is applicable to the left and the right downlock sensors for the main gear.
B.
References
(1)
AMM 24-22-00/201, Manual Control
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-61-31
ALL ú ú 04 Page 404 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
C. Access
(1)
Location Zones
216 Left Main Wheel Well
217 Right Main Wheel Well
310 Left Main Landing Gear
410 Right Main Landing Gear
D.
Procedure (Fig. 401)
S 434-010
(1)
Do these steps to put the sensor wires through the flexible conduit:
(a)
Twist the sensor leads together.
(b)
Attach the pull-line that you used for the removal of the sensor to the sensor leads.
(c)
Carefully pull the sensor wires through the flexible conduit with the pull-line.
S 424-011
(2)
Put the sensor and the sensor cover in position on the mounting bracket.
(a)
Install the mounting bolts, but do not tighten them at this time.
S 824-012
(3)
Adjust the sensor on the mounting bracket until you have the clearance shown on Fig. 401.
(a)
Tighten the mounting bolts.
S 434-013
(4)
Do these steps to connect the sensor wires:
(a)
Put the twisted sensor leads through the clamps for the wire bundles. 1) Tighten the clamps and attach the sensor wires to the wire
bundles with straps as it is necessary.
(b)
If the sensor wires are too long, cut the wires to the correct length.
(c)
If you will use splices to connect the sensor leads to the airplane, then connect the the sensor leads to the airplane wiring with splices. (SWPM 20-30-12)
(d)
If you removed the sensor leads at the connector, then do these steps: 1) Replace the pins on the sensor lead ends. 2) Install the lead pins in the electrical connector.
a) Make sure that you installed the pins in the correct
location. 3) Connect the third wire (yellow) at the ground point. 4) Connect the electrical connector.
S 864-014
(5) Make sure the control lever for the landing gear is in the DN position.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-61-31 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 3(163)