• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:53来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (a)  
Remove the rigging pin 5.

 (b)  
Release the clutch arm.


 NOTE: The spring will load the clutch arm against the cam
____ rollers to adjust the eccentric crank.
 (c)  If it is necessary, adjust the idler link.
 NOTE: The bolt must install correctly through the eccentric
____ crank and the idler link.
 (d)  Install the bolt, the washer, and the nut.
 NOTE: The rigging pins 1 and 5 must install correcly with
____ the clutch arm held off the cam follower.
 (e)  
Remove the rigging pin 1.

 (f)  
Install the clips to lock the turnbuckles of the cables NGPPA and NGPPB.

 (g)  
Make sure you remove the rigging pin 1 from the quadrant.

 (h)  
Make sure you remove the rigging pin 5 from the position cable drum.

 (i)  
Close the AIR/GND circuit breaker of the NOSE LANDING GEAR on the P6 panel.

 (j)  
Do a test on the steering system of the nose wheel (refer to paragraph 2).


 TASK 32-51-00-805-017
 3. Nose Wheel Steering System Adjustment
______________________________________
 A. Standard Tools and Equipment
 (1)  
Rigging Pins Kit - F70207-107

 (2)  
Cable Tensiometer

 (3)  
Aluminum sheet, 2.0 inches X 1.0 inch X +/- .05 inch

 B.
References

 (1)  
AMM 07-11-21/201, Jack Airplane

 (2)  
AMM 29-15-00/201, Hydraulic Systems A and B

 (3)  
AMM 32-00-01/201, Ground Lock Assemblies

 C.
Prepare to Adjust the Steering System of the Nose Wheel


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-51-00
 ALL  ú ú 02 Page 503 ú Jul 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500
MAINTENANCE MANUAL

TURNBUCKLES
NWSB
NWSA
SEE A
SEE B TURNBUCKLE (NWSB)
NGPPA
TURNBUCKLE NGPPB
(NWSA)
NWSB SEE C SEE D NWSA
TURNBUCKLE
NWSA
NWSB  FWD
TABLE I 1
RIG LOAD (LBS) 3TEMPERATURE `F 2
130 56
11051
9046
7040
5035
3029
10 24
-10 18
-22 15 4
-30 13 4
-40 10 4
1  RIG LOADS WHEN INSIDE AND OUTSIDE TEMPERATURES OF AIRPLANE ARE THE SAME
2  AMBIENT TEMPERATURE (`F) OF AIRPLANE WITHIN |5`F. AMBIENT TEMPERATURE SHOULD BE STABLE FOR ONE HOUR PRIOR TO RIGGING
3 CABLE LOADS MUST BE WITHIN (+10/-0) POUNDS OF VALUES SHOWN WHEN SYSTEM IS BEING RIGGED. AFTER INITIAL RIGGING, ANY DEVIATION OF (+15/-5) POUNDS, AT -22`F OR ABOVE, SHALL REQUIRE THAT THE SYSTEM BE RERIGGED
4 AT TEMPERATURES BELOW -22`F, MINIMUM ALLOWABLE CABLE LOAD SHALL BE 10 POUNDS
Nose Wheel Steering Adjustment Figure 501 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-51-00
 ALL  ú ú 01 Page 504 ú Jul 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL 
CLUTCH ARM CABLE NGPPA CABLE NGPPB QUADRANT  NWSA  RIGGING PIN 1 
IDLER LINK  NWSA 
AIRPLANE STRUCTURE  ECCENTRIC CRANK CABLE DRUM  RIGGING PIN 5  RUDDER PEDAL STEERING CONTROL ROD 
FWD 

DRUM HOUSING 
SIDEWALL 
NWSB  STEERING WHEEL  B  RIGGING PIN 2 FWD 
Nose Wheel Steering Adjustment Figure 501 (Sheet 2) 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-51-00
 ALL  ú ú 01 Page 505 ú Feb 20/84
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
CAPTAIN'S RUDDER PEDALS
BEAM FLOOR CABIN 
C  (2 LOCATIONS) FWD RIGGING PIN 3 
RIGGING PIN 4  NWSB  NWSA 
BOLT 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 3(119)