3.
SPHERICAL BEARING
4.
LOCKPIN
5.
SPRING
PIN
6.
TRUNNION
A
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-51-31
ALL ú ú 01 Page 402 ú Jul 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
34. TRUNNION PIN
CABLE NWSA/B (K)
39. COVER
SEE C
35. UPPER TORSION LINK
TORSION 36. LOWER 18. STEERING COLLAR
LINK
38. STEERING
CYLINDER
37. SHOCK 21. SPRING PIN
STRUT FWD
B
NWSA/B (K) COLLAR 18A. STEERINGCABLE TERMINAL
19. LOCKWIRE
FWDCABLE
20. STEERING COLLAR NWSB
21A. COTTER CABLE GROOVE PINS
STEERING CYLINDER WITH TWO CABLES
C
CABLE NWSA/B
STEERING COLLAR CABLE GROOVE
STEERING CYLINDERWITH SINGLE CABLE
C
Steering System Cables Installation Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-51-31
ALL ú ú 01 Page 403 ú Nov 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
NGPPA
NGPPB
24. NGPPA CABLE 1TERMINAL
PULLEY ACTUATOR ROTARY
25. NGPPB CABLE 1TERMINAL
FWD D 1 _______CAUTION: AFTER INSTALLATION. MUST NOT CONTACT ENDS OF COTTER PIN HOUSING OF ACTUATOR
26. COTTER KEY
33. BRACKET MOUNTING UPPER 27. QUADRANT 28. GUARD CABLE 29. BUS ROD
30. RIG PIN
32. CABLE DRUM
FWD
31. RIG PIN
E
Steering System Cables Installation
Figure 401 (Sheet 3)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-51-31
ALL ú ú 01 Page 404 ú Feb 20/84
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
D. Procedure to Remove the Position Cables
S 034-006
(1)
Loosen the turnbuckles (41) of the position cables (NGPPA and NGPPB).
S 034-007
(2)
Disconnect the position cables (NGPPA and NGPPB) of the nose landing gear from the rotary actuator pulley.
(a)
Remove the cotter pins (24) at the ends of the cable terminals (25) on each side of the rotary actuator pulley.
TASK 32-51-31-404-044
3. Position Cables Installation (Fig. 401)
____________________________
A. References
(1)
AMM 27-09-14/201, Flight Control Cables
(2)
AMM 32-51-00/501, Nose Wheel Steering System
B.
Procedure to Install the Position Cables
S 434-045
(1) String the replacement cables.
NOTE:____For cable length and fittings, see chart on Fig. 402. For general cable installation information (AMM 27-09-14/201).
S 434-048
CAUTION: MAKE SURE THE ENDS OF THE COTTER PINS WILL NOT TOUCH THE
_______
HOUSING OF THE ACTUATOR AFTER YOU INSTALL.
(2)
Connect the position cables NGPPA (24) and NGPPB (25) to the rotary actuator pulley.
(3)
Connect the cables to their turnbuckles (41).
(4)
Adjust the position system (AMM 32-51-00/501).
(5)
Install the locking clips in the turnbuckles.
S 434-009
S 824-046
S 434-010
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-51-31
ALL ú ú 02 Page 405 ú Mar 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 3(130)