• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:53来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (a)  Install the steering collars (AMM 32-51-61/401).
 1)  Do not tighten the nut for the steering cylinder attach bolt, it should be loose at this time.
 NOTE: The steering cylinder must be centered with
____ the steering collar lug before you tighten the nut for the steering collar/rod end attach bolt.
 (b)  
Connect the upper torsion link to the outer cylinder
 (AMM 32-21-31/401).


 (c)  
Adjust the upper trunnion locknut (1) to get approximately 0.01 inch clearance between the bottom of the rod end and the lower bushing in the steering collar.


 NOTE: Zero torque on lower trunnion locknut.
____
 (d)  Tighten the lower trunnion locknut (15) 180 to 200 inch-pounds. 1) Loosen to zero, then tighten 90 to 100 inch-pounds.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-51-51
 ALL  ú ú 02 Page 407 ú Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (e)  If it is necessary, adjust the upper (1), and the lower (15) trunnion locknuts to get the final clearance of 0.001 to 0.003 inch between the bottom of the rod end and the lower bushing in the steering collar lug.
 NOTE:____ Loosen and tighten the upper and the lower trunnion locknuts equally to maintain the torque while adjusting.
 (f)  Tighten the nut for the steering cylinder attach bolt (AMM 32-51-61/401).
 (5)  S 434-056Bend a washer tab fully into one of the slots in the nut.
 NOTE:____ If it is necessary, turn the locknuts to line up a slot with the next available washer tab.
 (6)  S 824-082Turn the torsion link and the steering collar to approximately 55 degrees to the left.
 (7)  S 434-046Install the attach bolt (9) of the cable guard to attach the right cable guard (8) to the upper support plate (4).
 (8)  S 824-113Adjust the right cable guard (8) to clear the pulley by 0.015 to 0.045 inch. (a) If it is necessary, use a maximum of two washers (BACW10P635) to align the bottom of the cable guard with the bottom of the cable quadrant.
 (9)  S 714-045Turn the torsion link and the steering collar to approximately 110 degrees to the right.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-51-51
 ALL  ú ú 02 Page 408 ú Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 434-112
 (10)
 Install the attach bolt of the cable guard to attach the left cable guard to the upper support plate (4).

 S 824-114

 (11)
 Adjust the left cable guard to clear the pulley by 0.015 to 0.045 inch.

 (a)  
If it is necessary, use a maximum of two washers (BACW10P635) to align the bottom of the cable guard with the bottom of the cable quadrant.


 S 424-044
 (12)
 Install the steering metering valve (AMM 32-51-11/401).

 S 034-109

 (13)
 Do the steps below to connect the steering cables:

 (a)  
AIRPLANES WITH TWO STEERING CABLES; Install the spring pins (27) on the cable groove of the steering collar then install lockwire (28).

 (b)  
AIRPLANES WITH SINGLE STEERING CABLE; Install the cotter pins (26) on the cable groove of the steering collar.


 S 094-041
 (14)
 Remove the rigging pin you installed in the steering drum in the control cabin.

 S 824-040

 (15)
 Measure and adjust the cable tension, if it is necessary (AMM 32-51-00/501).


 TASK 32-51-51-704-003
 4.  Nose Landing Gear Steering System Examination_____________________________________________
 A. References
 (1)  AMM 07-11-21/201, Jack Airplane
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-51-51
 ALL  ú ú 02 Page 409 ú Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 起落架 LANDING GEAR 3(138)