(b)
Boeing test cables with adapters (optional): 1) F72731-119 - center tank 2) F72731-121 - tanks No. 1 and 2 3) Tee connectors:
a) LC-93-03 (Kings Electronics, 40 Marblehead Road, Tuckahoe, NY 10707) - for Lo-Z connections, two are necessary
b) UG274A/U - for Hi-Z connection, one is necessary 4) Adapter cables (fabricated locally):
a) Adapter cables - 50 ohm, unshielded, with polarized BNC plug (Amphenol 14625) to connect to the Lo-Z receptacles of the test unit and polarized BNC jack (Kings LC-33-02) to connect to the tee connector, two are necessary.
NOTE: Shielded cables on Lo-Z connections can
____ cause EMI problems.
b) Adapter cable - 50 ohm, with BNC plug (Amphenol 31-202) to connect to the Hi Z receptacle on the test unit and a BNC receptacle (AMP 330885) to connect to the tee connector.
5) Ground cable
B. References ú (1) AMM 24-22-00/201, Manual Control ú (2) AMM 28-23-00/201, Defueling
C. Access
(1) Location Zones
101 Control Cabin, Left
402 Right Wing Outboard Leading Edge
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH SIMMONDS DIGITAL FUEL ú
28-41-02 QUANTITY INDICATORS ú CONFIG 2
ú 01.1 Page 504 (SIMMONDS SYSTEM TESTER) ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
(2) Access Panels
6540 Refueling Station Access Door
D. Prepare for the Trim
S 865-014-002
(1) Connect the external electrical power (Ref 24-22-00/201).
S 655-015-002
(2) Remove all fuel from the fuel tank, and the fuel in the sumps ú (AMM 28-23-00/201).
NOTE: If you do the trim for only one tank system, you can move
____
the fuel into the other tanks.
S 865-016-002
(3) Open these circuit breakers and attach DO-NOT-CLOSE tags:
(a) P6 Main Power Distribution Panel
1) QTY
2) EP GND FUELING
S 485-017-002
(4) Connect the test equipment.
(a)
Remove the fuel quantity indicator from the pilots' panel (Fig. 501).
(b)
Disconnect the electrical connector from the rear of the indicator.
(c)
Connect the test harness to the aircraft wire bundle.
(d)
Connect the test harness to the system test unit (Fig. 502).
S 975-018-002
(5) Measure the empty tank capacitances.
(a)
Set the FUNCTION SEL switch on the test unit to EXT CAP (PSD40-1) or set the FUNCT switch to MEASURE EXT (PSD60-1).
(b)
Set the FUNCTION MEASURE switch (PSD40-1) or the SELECT switch (PSD60-1) to COMP.
(c)
Set the power switch to ON.
(d)
Measure the capacitance of the compensator.
1) The capacitance of must be 40.2 picofarad (pf) with a tolerance of |1.2 pf.
(e)
Set the FUNCTION MEASURE switch (PSD40-1) or the SELECT switch (PSD60-1) to TU.
(f)
Measure the capacitance of the tank units.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH SIMMONDS DIGITAL FUEL ú
28-41-02 QUANTITY INDICATORS ú CONFIG 2
ú 01.1 Page 505 (SIMMONDS SYSTEM TESTER) ú Jul 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
FUEL QUANTITY INDICATOR TEST SWITCH
Fuel Quantity Indicating System Component Location
Figure 501 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH SIMMONDS DIGITAL FUEL ú 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-300 400 500 AMM 飞机维护手册 燃油 FUEL 3(86)