EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-41-44
ALL ú
ú 01 Page 603
ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
M10408
A
737-300/400/500MAINTENANCE MANUAL
C. Procedure
S 286-002
(1) For the area in the No. 1 fuel tank between rib No. 1 (side of body rib at WBL 71.24) and rib No. 5 (at WBL 157.00), do these steps:
(a)
Remove access panel No. 1 (7202) on the left wing (AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 1 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 1 and rib No. 5: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48303 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 1 (AMM 28-11-11/401).
S 286-003
(2) For the area in the No. 1 fuel tank between rib No. 5 (rib at WBL 157.00) and rib No. 7 (rib at WBL 198.60), do these steps:
(a)
Remove access panel No. 2 (7204) on the left wing (AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 2 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 5 and rib No. 7: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48303 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 2 (AMM 28-11-11/401).
S 286-004
(3) For the area in the No. 1 fuel tank between rib No. 7 (rib at WBL 198.60) and rib No. 8 (rib at WBL 227.00), do these steps:
(a)
Remove access panel No. 3 (7205) on the left wing (AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 3 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 7 and rib No. 8: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48303 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 3 (AMM 28-11-11/401).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-41-44
ALL ú ú 01 Page 604 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 286-005
(4) For the area in the No. 1 fuel tank between rib No. 8 (rib at WBL 227.00) and rib No. 9 (rib at WBL 254.00), do these steps:
(a)
Remove access panel No. 4 (7206) on the left wing
(AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 4 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 8 and rib No. 9: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48305 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 4 (AMM 28-11-11/401).
S 286-006
(5) For the area in the No. 1 fuel tank between rib No. 9 (rib at WBL 254.00) and rib No. 10 (rib at WBL 279.25), do these steps:
(a)
Remove access panel No. 5 (7207) on the left wing
(AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 5 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 9 and rib No. 10: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48305 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 5 (AMM 28-11-11/401).
S 286-007
(6) For the area in the No. 1 fuel tank between rib No. 10 (rib at WBL 279.25) and rib No. 11 (rib at WBL 304.50), do these steps:
(a)
Remove access panel No. 6 (7208) on the left wing
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 燃油 FUEL 3(126)