locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 11 (AMM 28-11-11/401).
S 286-013
(12) For the area in the No. 1 fuel tank between rib No. 16 (rib at WS 505.00) and rib No. 17 (rib at WS 531.00), do these steps:
(a)
Remove access panel No. 12 (7214) on the left wing
(AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 12 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 16 and rib No. 17: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48305 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 12 (AMM 28-11-11/401).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-41-44
ALL ú ú 01 Page 607 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
TASK 28-41-44-286-014
4. FQIS, No. 2 Tank - Inspection_____________________________
A. References
(1)
AMM 28-10-00/201, Fuel Tanks
(2)
AMM 28-11-11/401, Wing Fuel Tank Access Panels
(3)
DWG 65-48304 Wire Bundle Instl - Sec. 20, RH Inboard Inspar, WBL
71.24 - WBL 227.
(4)
DWG 65-48306 Wire Bundle Instl - Sec 20 RH Inspar WBL 227 to Wingtip
B. Access
(1) Location Zones
405 Right Fuel Tank
C. Procedure
S 286-015
(1) For the area in the No. 2 fuel tank between rib No. 1 (side of body rib at WBL 71.24) and rib No. 5 (at WBL 157.00), do these steps:
(a)
Remove access panel No. 1 (7402) on the right wing (AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 1 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 1 and rib No. 5: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48304 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 1 (AMM 28-11-11/401).
S 286-016
(2) For the area in the No. 2 fuel tank between rib No. 5 (rib at WBL 157.00) and rib No. 7 (rib at WBL 198.60), do these steps:
(a)
Remove access panel No. 2 (7404) on the right wing (AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 2 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 5 and rib No. 7: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48304 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 2 (AMM 28-11-11/401).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-41-44
ALL ú ú 01 Page 608 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 286-017
(3) For the area in the No. 2 fuel tank between rib No. 7 (rib at WBL 198.60) and rib No. 8 (rib at WBL 227.00), do these steps:
(a)
Remove access panel No. 3 (7405) on the right wing
(AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 3 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 7 and rib No. 8: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48304 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 3 (AMM 28-11-11/401).
S 286-018
(4) For the area in the No. 2 fuel tank between rib No. 8 (rib at WBL 227.00) and rib No. 9 (rib at WBL 254.00), do these steps:
(a)
Remove access panel No. 4 (7406) on the right wing
(AMM 28-11-11/401).