T  LOZ-HIZ 
U  COMP-HIZ  10-200 PF  10-2000 PF 
LOZ-COMP  S 
HIZ  LOZ-SHLD  E 
O C  SHLD  H  COMP-SHLD  L E 
M  M  HIZ-SHLD  C 
P  SHLD-GND  T 
COMP  LOZ-GND 
COMP-GND 
C  HIZ-GND 

SYSTEM
TESTER

CONNECT TO
AIRFRAME
GROUND

AIRCRAFT
J1
WIRING CONNECTOR
AND J1 HARNESS
INDICATOR PSD60-503 IFQT
DO NOT DO NOT CONNECT CONNECT
INDICATOR-TO-IFQT
Test Equipment Set-Up for Insulation Resistance Check Figure 602 (Sheet 3)
M46299
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù.
 AIRPLANES WITH ISOLATED FUEL QUANTITY  ú 28-41-91
 TRANSMITTER (IFQT)  ú CONFIG 2 ú 01 Page 609 ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 (5)  S 766-023-002Set the FUNCTION SEL switch to MEG (not SELF TEST MEG) (PSD40-1) or set the FUNCT switch to MEASURE EXT (PSD60-1).
 (6)  S 766-024-002Set the FUNCTION MEASURE switch (PSD40-1) or set the SELECT switch (PSD60-1) to LoZ - HiZ.
 (7)  S 766-025-002Read the total resistance for the tank units. (a) Make sure that the measured resistance is more than 250 megohms.
 (8)  S 766-026-002Set the FUNCTION MEASURE switch (PSD40-1) or set the SELECT switch (PSD60-1) to COMP-HIZ.
 (9)  S 766-027-002Read the total resistance for the compensator. (a) Make sure that the measured resistance is more than 250 megohms.
 S 766-028-002

 (10) Set the FUNCTION MEASURE switch (PSD40-1) or set the SELECT switch (PSD60-1) to each of the SHLD or GND positions shown in the table below.
 (a)  Make sure that the measured resistance is more than the minium resistance specified:
 ~............................................................ | |MINIMUM RESISTANCE| | SYSTEM TEST SET SWITCH POSITION | (Megohms) | .............................................................. |HIZ - GND (HiZ to Airframe ground) | 10 | .............................................................. |LOZ - GND (LoZ to Airframe ground) | 10 | .............................................................. |COMP - GND (Comp LoZ to Airframe ground) | 10 | .............................................................. |LOZ - SHLD (UT LoZ to Airframe ground) | 1 | .............................................................. |COMP - SHLD (Comp LoZ to Coax Shld) | 1 | .............................................................. |HIZ - SHLD (HiZ to Coax Shld) | 1 | .............................................................. |SHLD - GND (Coax Shld to Airframe ground)| 10 | 2.........................................…..................1
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù.
 AIRPLANES WITH ISOLATED FUEL QUANTITY  ú 28-41-91
 TRANSMITTER (IFQT)  ú CONFIG 2 ú 01 Page 610 ú Mar 12/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 766-029-002
 (11) If a measured resistance value is less that the minimum value, do a check for:
 (a)  
A short circuit at the J2 connector (at the IFQT-end of the harness).

 (b)  
A short circuit at the 3-pin connector (at the tank connector-end of the harness).


 G. Resistance Check of the IFQT-to-Indicator Harness
 S 036-030-002
 (1)  
Remove the plug on the flight deck and refuel panel indicators (for the channel to be checked).

 S 496-031-002

 (2)  
Connect the test cable (PN PSD60-503) between the test set and the applicable IFQT wire harness, but do not connect to the indicator (Fig. 602).

 S 036-032-002

 (3)  
Disconnect the IFQT wire harness from the applicable IFQT-J1 connector.

 S 766-033-002

 (4)  
Set the power switch on the test unit to ON.

 S 766-034-002

 (5)  
Set the FUNCTION SEL switch to MEG (not SELF TEST MEG) (PSD40-1) or set the FUNCT switch to MEASURE EXT (PSD60-1).

 S 766-035-002

 (6)  
Set the FUNCTION MEASURE switch (PSD40-1) or set the SELECT switch (PSD60-1) to LoZ - HiZ.
 