(b)
Go into the opening for access panel No. 4 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 8 and rib No. 9: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48306 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 4 (AMM 28-11-11/401).
S 286-019
(5) For the area in the No. 2 fuel tank between rib No. 9 (rib at WBL 254.00) and rib No. 10 (rib at WBL 279.25), do these steps:
(a)
Remove access panel No. 5 (7407) on the right wing
(AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 5 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 9 and rib No. 10: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48306 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 5 (AMM 28-11-11/401).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-41-44
ALL ú ú 01 Page 609 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 286-020
(6) For the area in the No. 2 fuel tank between rib No. 10 (rib at WBL 279.25) and rib No. 11 (rib at WBL 304.50), do these steps:
(a)
Remove access panel No. 6 (7408) on the right wing
(AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 6 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 10 and rib No. 11: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48306 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 6 (AMM 28-11-11/401).
S 286-021
(7) For the area in the No. 2 fuel tank between rib No. 11 (rib at WBL 304.50) and rib No. 12 (rib at WBL 329.75), do these steps:
(a)
Remove access panel No. 7 (7409) on the right wing
(AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 7 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 11 and rib No. 12: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48306 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 7 (AMM 28-11-11/401).
S 286-022
(8) For the area in the No. 2 fuel tank between rib No. 12 (rib at WBL 329.75) and rib No. 13 (rib at WBL 355.00), do these steps:
(a)
Remove access panel No. 8 (7410) on the right wing
(AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 8 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 12 and rib No. 13: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48306 for wiring and component
locations.
(d)
If access is not necessary for subsequent tasks, install access panel No. 8 (AMM 28-11-11/401).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-41-44
ALL ú ú 01 Page 610 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 286-023
(9) For the area in the No. 2 fuel tank between rib No. 13 (rib at WBL 355.00) and rib No. 14 (rib at WS 453.00), do these steps:
(a)
Remove access panel No. 9 (7411) on the right wing
(AMM 28-11-11/401).
(b)
Go into the opening for access panel No. 9 (AMM 28-10-00/201).
(c)
Do this task for all FQIS wiring and components between rib No. 13 and rib No. 14: FQIS Wiring and Component Visual Inspection. 1) Refer to drawing 65-48306 for wiring and component
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 燃油 FUEL 3(129)