• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 05:53来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 2. Operational Test - Fuel Quantity Indicating System
__________________________________________________
 A. Access
 (1)  
Location Zones
 101 Control Cabin, Left
 402 Right Wing Outboard Leading Edge


 (2)  
Access Panels
 6540 Refueling Station Access Door

 

 B. Procedure
 S 865-002-001
 (1)  Make sure these circuit breakers are closed:
 (a)  P6 Main Power Distribution Panel
 1) QTY
 2) EP GND FUELING

 S 975-003-001
 (2)  
Write the values shown on the fuel quantity indicators.

 S 715-004-001

 (3)  
Push and hold the QTY TEST switch adjacent to the fuel quantity indicators.

 S 715-005-001

 (4)
Make sure the fuel quantity indicators go to a value of zero.

 S 715-006-001

 (5)  
Release the test switch.

 (a)  Make sure the fuel quantity indicators show the same values that you wrote before this step to a tolerance of |50 pounds (|25 kgs).

 (6)  
Open the access door for the refuel control panel (P15).

 (7)  
Write the values shown on the refuel quantity indicators.

 (8)  
Set and hold the test switch to TEST GAGES.

 (9)
Make sure the refuel quantity indicators go to a value of zero.


 S 015-007-001
 S 975-008-001
 S 715-009-001
 S 715-010-001
 NOTE: The value on the refuel quantity indicator increases when you
____
 set the P15 test switch.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù.
 AIRPLANES WITH ANALOG FUEL QUANTITY ú  28-41-00
 INDICATORS ú CONFIG 1 ú 01A Page 502 (GULL SYSTEM TESTER) ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 715-011-001
 (10) Release the test switch.
 (a)  Make sure the refuel quantity indicators show the same values that you wrote before this step to a tolerance of |50 pounds (|25 kilograms).
 S 415-012-001
 (11) Close the access door for the P15 panel on the wing.
 TASK 28-41-00-825-013-001
 3. System Trim - Fuel Quantity Indicating System
_____________________________________________
 A. Equipment
 (1)  
System test unit - Model GTF-2, P/N 361-012-001, Gull Airborne Instruments Inc., 55 Engineers Road, Smithtown, N.Y. 11787

 (2)  
Test harnesses


 NOTE:____You must control the quality of the test cables. Make sure the stray capacitance for the test cables is less than
 0.2 pf.
 (a)  
F72731-115 - center tank

 (b)  
F72731-117 - tanks No. 1 and No. 2


 B. References
 (1)  
AMM 24-22-00/201, Manual Control

 (2)  
AMM 28-23-00/201, Defueling


 C. Access
 (1)  
Location Zones
 101 Control Cabin, Left
 402 Right Wing Outboard Leading Edge


 (2)  
Access Panels
 6540 Refueling Station Access Door

 

 D. Prepare for the Trim
 S 865-014-001
 (1)
Connect the external electrical power (AMM 24-22-00/201).

 S 655-015-001

 (2)  
Remove all the fuel from the fuel tank, and remove the fuel in the sumps (AMM 28-23-00/201).


 NOTE: If you do the trim for only one tank, you can move the
____
 fuel into the other tanks.

 S 865-016-001
 (3) Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  P6 Main Power Distribution Panel
 1) EP GND FUELING

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù.
 AIRPLANES WITH ANALOG FUEL QUANTITY ú  28-41-00
 INDICATORS ú CONFIG 1 ú 01A Page 503 (GULL SYSTEM TESTER) ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 2) QTY
 S 485-017-001
 (4)  Connect the test equipment.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 燃油 FUEL 3(40)