(3)
AMM 20-40-12/401, Electrostatic Sensitive Discharge Devices
B. Access
(1) Location Zone
16 Left Main Wheel Well
C. Install the Engine Fire Extinguish Bottle
S 284-056
(1) Weigh the bottle.
(a) The bottle weight must be +0/-.10 pound within the total weight shown on the tag.
S 034-051
(2) Remove the lockwire from each bottle discharge port assembly coupling.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
26-21-11
ALL ú ú 06 Page 403 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
S 434-011
(3)
Support the fire extinguisher bottle in the support frame and install the mounting bolts.
S 434-012
(4)
Connect the discharge lines to the discharge outlet.
S 434-015
(5)
Tighten the retaining nut at the discharge outlet to 45-55
pound-feet.
S 434-016
(6)
Put the discharge squibs in the discharge outlets.
NOTE: The squib must be inspected for damage with special attention
____ given to the soft seal, opposite the electrical connector, which protects the explosive charge. If punctured or otherwise damaged, the squib must be replaced with a new part.
(a)
Tighten the squib to 90 to 100 pound-inches.
(b)
Lockwire the squib to the discharge outlet.
D. Test the bottle installation.
S 754-017
(1)
Visually check that the engine fire extinguishing tubing is routed correctly.
S 864-018
(2)
Supply electrical power (AMM 24-22-00/201).
S 754-019
(3)
Make sure all four squib electrical connectors and both pressure switch connectors are disconnected.
S 434-020
(4)
Install protective covers on each engine squib.
S 864-021
(5)
Close these circuit breakers on the P6-2 panel:
(a)
EXTINGUISHER BOTTLES RIGHT
(b)
EXTINGUISHER BOTTLES LEFT
(c)
EXTINGUISHER BOTTLE RIGHT
(d)
EXTINGUISHER BOTTLE LEFT
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
26-21-11
ALL ú ú 03 Page 404 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
S 864-050
(6) Close these circuit breakers:
(a) CONTROL CABIN LIGHTING INDICATOR LIGHTS MASTER DIM BUS (nine
circuit breakers) on panel P6-3
S 864-022
(7) Put a jumper across pins 1 and 2 of connector D586 on the left
(forward) fire extinguisher bottle pressure switch.
(a) Make sure the L BOTTLE DISCHARGED light on the P8-1 panel comes
on.
S 864-023
(8)
Remove the jumper from pins 1 and 2 of electrical connector D586.
S 864-024
(9)
Reconnect the electrical connector D586 to left (forward) fire extinguisher bottle pressure switch.
S 864-025
(10)
Put a jumper across pins 1 and 2 of connector D588 on the right (aft) fire extinguisher bottle pressure switch.
(a) Make sure the R BOTTLE DISCHARGED light on the P8-1 panel comes on.
S 864-026
(11)
Remove the jumper from pins 1 and 2 of electrical connector D588.
S 864-027
(12)
Reconnect the electrical connector D588 to right (aft) fire extinguisher bottle pressure switch.
S 864-028
(13)
Set and hold the EXT TEST switch on the P8-1 panel in position 1.
(a) Make sure all of the lights on the panel P8-1 stay off.
S 864-029
(14) Set and hold the EXT TEST switch on the P8-1 panel in position 2.
(a) Make sure all of the lights on panel P8-1 stay off.
S 864-030
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 防火 FIRE PROTECTION(97)