(j)
DIM & TEST
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
26-21-00
ALL ú ú 01 Page 501 ú Nov 15/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
D. Do a Test of the Engine Squib Circuits
S 755-007
(1)
Make sure all the lights on the P8-1 panel are off.
S 865-008
(2)
Set and hold the EXT TEST switch on the P8-1 Engine and APU Fire Control Panel, to 1.
S 755-009
(3)
Makes sure only these lights on the P8-1 panel come on:
(a)
R (green)
(b)
L (green)
(c)
APU (green)
S 865-172
(4)
Release the EXT TEST switch.
S 755-171
(5)
Make sure all of the lights on the P8-1 panel go off.
S 865-010
(6)
Set and hold the EXT TEST switch on the P8-1 panel at 2.
S 755-011
(7)
Make sure only these lights on the P8-1 panel come on:
(a)
R (green)
(b)
L (green)
(c)
APU (green)
S 865-012
(8)
Release the EXT TEST switch.
S 755-013
(9)
Make sure all of the lights on the P8-1 panel go off.
E. Do a Test of the Pressure Switch Circuits.
S 865-014
(1)
Install a jumper across pins 1 and 2 of connector D586.
(a) Make sure L BOTTLE DISCHARGED light (amber) comes on.
(2)
Remove the jumper from pins 1 and 2 of connector D586.
S 865-016
(3)
Install a jumper across pins 1 and 2 of connector D588.
(a) Make sure the R BOTTLE DISCHARGED light (amber) comes on.
(4)
Remove the jumper from pins 1 and 2 of connector D588.
S 865-015
S 865-017
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
26-21-00
ALL ú ú 01 Page 502 ú Jul 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
F. Put the Airplane in its usual condition.
S 865-018
(1)
Remove electrical power if it is not necessary (AMM 24-22-00/201).
S 865-019
(2)
Connect the connector D586 to the left (forward) fire extinguisher bottle pressure switch and D588 to the right (aft) fire extinguisher bottle pressure switch.
TASK 26-21-00-735-020
3. Engine Fire Extinguishing - System Test_______________________________________
A. General
(1) This test procedure examines the two engine fire switch circuits between the P8 panel and each squib connector.
B. Equipment
(1)
F80229-15 Test Equipment, Fire Extinguishing System
(2)
Multimeter 0-1000v dc |1%, 0-750v ac, 0-2 amps, 0-2 megohm (commercially available)
C. References
(1)
AMM 24-22-00/201, Power - Control
(2)
AMM 20-40-12/201, Electrostatic Sensitive Discharge Devices
D. Access
(1) Location Zone
101, 102 Control Cabin
E. Prepare for the Test
S 865-165
(1)
Supply electrical power (AMM 24-22-00/201).
S 865-021
(2)
Open these circuit breakers on the P6-2 panel and attach DO-NOT-CLOSE tags:
(a)
EXTINGUISHER BOTTLES RIGHT
(b)
EXTINGUISHER BOTTLES LEFT
(c)
EXTINGUISHER BOTTLE RIGHT
(d)
EXTINGUISHER BOTTLE LEFT
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 防火 FIRE PROTECTION(89)