Cargo Fire Control Panel Installation
(a) If the installation test for the CARGO FIRE panel is
satisfactory, then you corrected the fault.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
26-23-00
ALL ú ú 02 Page 207 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
CARGO COMPARTMENT FIRE EXTINGUISHING - ADJUSTMENT/TEST
______________________________________________________
1. General_______
A. This procedure has these tasks:
(1)
An operational test
(2)
A test of the squib circuit
(3)
A test of the pressure switch circuit
(4)
An airflow test through the discharge tubes
(5)
A pressure test of the discharge tubes
TASK 26-23-00-715-111
2. Operational Test
A. Do the operational test.
S 715-113
(1) Push and hold the TEST switch on the Cargo Fire Control panel.
(a) Make sure the FWD EXT and AFT EXT lights come on.
NOTE:____Other indications can occur during this test. The other indications are not important for this test.
S 715-112
(2) Release the TEST switch.
TASK 26-23-00-705-001
3. Squib Circuit Test (Fig. 501)__________________
A. References
(1) AMM 24-22-00/201, Manual Control
B. Equipment
(1)
Test box - Cargo Fire Extinguishing System, PN C26006-1
(2)
Multimeter
C. Access
(1)
Location Zones
208 Forward Cargo Compartment
101 Control Cabin - Left
102 Control Cabin - Right
(2)
Access Panels
4404R, Forward Cargo Compartment
D. Prepare for the Test
S 865-002
(1)
Supply Electrical Power (AMM 24-22-00/201)
S 865-003
(2)
Open this circuit breaker and install a DO-NOT-CLOSE tag:
(a) Circuit Breaker Panel, P6 or P18 1) LWR CARGO FIRE EXT 1
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. AIRPLANES WITH LOWER CARGO ú
26-23-00
FIRE EXTINGUISHING SYSTEM ú ú 01 Page 501 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
S 015-004
(3)
Open the forward cargo door, 4404R.
S 015-005
(4)
Remove the lining at the aft end of the forward cargo compartment to get access to the fire extinguishing bottle.
E. Squib Circuit Test
S 035-006
(1) Disconnect the electrical connector from the squibs.
(a)
Disconnect D12794 from the FWD squib, M2249.
(b)
Disconnect D12796 from the AFT squib, M2250.
S 435-007
WARNING:_______PUT A PROTECTIVE COVER ON THE SQUIB. IF YOU DO NOT PUT A PROTECTIVE COVER ON THE SQUIB, THE FIRE EXTINGUISHING BOTTLE CAN RELEASE ITS CONTENTS SUDDENLY AND CAUSE INJURY TO PERSONS.
(2)
Install a protective cover on each squib.
S 485-084
(3)
Connect the squib connectors to the applicable connectors on the Cargo Fire Extinguishing System Test Box, PN C26006-1.
S 735-085
(4)
Set all the switches on the Test Box to NO DISCHARGE.
S 735-086
(5)
Make sure all the circuit breakers on the Test Box are closed.
S 865-008
(6)
Remove the DO-NOT-CLOSE tag and close this circuit breaker:
(a) Circuit Breaker Panel, P6 or P18
1) LWR CARGO FIRE EXT 1
S 735-088
(7)
Make sure none of the circuit breakers on the test box open.
S 735-009
(8)
Do a test of the forward cargo fire bottle squib circuit.
(a)
Set the EXT 1 FWD switch S3 on the Test Box to DISCHARGE.