___________________________________________________________________________
TASK 31-63-34-000-001
Removal of the DMC (1WT1,1WT2,1WT3)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R 52-41-00-010-002 Open the Avionics Compartment Doors for Access 31-63-34-991-001 Fig. 401
1EFF : ALL 1 31-63-34Page 401 1 1 Feb 01/03 1 1 1CES 1
3. Job Set-up
__________
Subtask 31-63-34-865-050
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 1WT1
49VU EIS/DMC1/SPLY 10WT1 E11
49VU EIS/DMC1/SWTG 21WT1 E09
FOR 1WT2 121VU EIS/DMC2/SPLY 10WT2 Q08 121VU EIS/DMC2/SWTG 21WT2 R08
FOR 1WT3 49VU EIS/DMC3/SWTG 21WT3 E07 121VU EIS/DMC3/SPLY 10WT3 Q09
Subtask 31-63-34-010-050
B. Get Access
(1) Put the access platform in position at the access door 824 in zone
128. R (2) Open the access door 824 (Ref. TASK 52-41-00-010-002).
4. Procedure
_________ R (Ref. Fig. 401/TASK 31-63-34-991-001) Subtask 31-63-34-020-050
A. Removal of the DMC
(1)
Loosen the nuts (3) on the front of the rack (2).
(2)
Lower the nuts (3).
(3)
Pull the DMC (5) on its rack (2) to disconnect the electrical connectors (1).
(4)
Remove the DMC (5) from its rack (2).
(5)
Put blanking caps on the electrical connectors (1).
1EFF : ALL 1 31-63-34Page 402 1 1 Feb 01/03 1 1 1CES 1
DMC
Figure 401/TASK 31-63-34-991-001
1EFF : ALL 1 31-63-34 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 31-63-34-400-001
Installation of the DMC (1WT1,1WT2,1WT3)
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R R 31-32-00-860-008 31-60-00-610-003 31-60-00-610-004 31-60-00-610-005 31-60-00-710-001 52-41-00-410-002 31-63-34-991-001 Procedure to Get Access to the SYSTEM REPORT/TEST/INST Page X LOADING Procedure of the DMC1 X LOADING Procedure of the DMC2 X LOADING Procedure of the DMC3Operational Test of the EISClose the Avionics Compartment Doors after AccessFig. 401
3. Job Set-up__________
Subtask 31-63-34-860-050
A. Aircraft Maintenance Configuration
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8(7)