2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure
3. Job Set-up
__________
Subtask 31-68-00-860-056
A. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002)
1EFF : ALL 1 31-68-00Page 417 1 1 Feb 01/05R 1 1 1CES 1
Subtask 31-68-00-865-052
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
49VU EIS/RLY/BOX/CAPT 17WT1 E08
R
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,
R 49VU EIS/PFD CAPT/SPLY 11WT1 E03
**ON A/C ALL
R 49VU EIS/ECAM/CTL/PNL 15WT E12
R 49VU EIS/DMC1/SPLY 10WT1 E11
R 49VU EIS/DMC3/STBY/SPLY 14WT1 E10
R 49VU EIS/DMC1/SWTG 21WT1 E09
R 49VU EIS/DMC3/SWTG 21WT3 E07
R 49VU EIS/ECAM DU/UPPER/SWTG 24WT1 E06
R 49VU EIS/ECAM DU/UPPER/SPLY 13WT1 E05
R 49VU EIS/PFD CAPT/SWTG 22WT1 E04
49VU EIS/ND CAPT/SWTG 23WT1 E02
49VU EIS/ND CAPT/SPLY 12WT1 E01
R **ON A/C 106-149, 303-399, 401-499,
R
49VU EIS/PFD/CAPT/SPLY 11WT1 E03
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
121VU EIS/RLY/BOX/F/O 17WT2 R07
1EFF : ALL 1 31-68-00Page 418 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C ALL
121VU EIS/DMC3/SPLY 10WT3 Q09 121VU EIS/DMC2/SPLY 10WT2 Q08 121VU EIS/ECAM DU/LOWER/SPLY 13WT2 R11 121VU EIS/ECAM DU/LOWER/SWTG 24WT2 R10 121VU EIS/DMC2/SWTG 21WT2 R08 121VU EIS/ND/F/O/SWTG 23WT2 R06 121VU EIS/PFD/F/O/SWTG 22WT2 R05 121VU EIS/ND/F/O 12WT2 R04 121VU EIS/PFD/F/O 11WT2 R03
R 122VU ELEC/AC/BUS1/CTL 17XN1 V25
Subtask 31-68-00-860-058
C. Aircraft Maintenance Configuration
(1)
Do the EIS Start Procedure (Ref. TASK 31-60-00-860-001)
(2)
On the center pedestal, on the SWITCHING panel 8VU, make sure that the EIS DMC selector switch is in the NORM position.
4. Procedure
_________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
Subtask 31-68-00-710-052
A. Check of the EIS DMC switch
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On C/B panel 49VU:
- open the circuit breaker 10WT1 A diagonal line comes into view on the CAPT PFD and ND and on the upper ECAM DU. On the lower ECAM DU, the EIS DMC1 FAULT message is displayed.
1EFF : ALL 1 31-68-00Page 419 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
-close the circuit breaker 10WT1
2. On C/B panel 121VU: - open the circuit breaker 10WT2
-close the circuit breaker 10WT2
R **ON A/C 401-499, Subtask 31-68-00-710-052-A
A. Check of the EIS DMC switch
The related images of each DU come into view.
A diagonal line comes into view on the F/O PFD and ND and on the lower ECAM DU. On the upper ECAM DU, the EIS DMC2 FAULT message is displayed.
The related images of each DU come into view.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8(169)