• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2010-08-22 12:03来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

rods [40] to the rudder forward quadrant [39].
(a) If it is necessary, adjust the length of the rudder pedal tension rods.
SUBTASK 27-21-51-080-002
(8) Remove rig pins R-3, R-4, R-1, and R-2.
SUBTASK 27-21-51-420-011
(9) If you install the captain’s rudder forward quadrant, then do these steps:
(a) Move the captain’s rudder forward quadrant [39] until it touches the quadrant stop [35].
(b) Make sure that you can install rig pin R-3 easily in the aft rig pin hole.
1) If it is necessary, add or remove the shims [34]:
a) Remove the nuts [38], washers [37], bolts [36], and fillers [33] from the quadrant
stops [35].
b) Add or remove the shims [34] laminations.
c) Install the fillers [33], bolts [36], washers [37], and nuts [38] to the quadrant stops
[35].
(c) Remove rig pin R-3.
SUBTASK 27-21-51-420-012
(10) If you install the first officer’s rudder forward quadrant, then do these steps:
(a) Move the first officer’s rudder forward quadrant [39] until it touches the quadrant stop [35].
(b) Make sure that you can install rig pin R-4 easily in the aft rig pin hole.
1) If it is necessary, add or remove the shims [34]:
a) Remove the nuts [38], washers [37], bolts [36], and fillers [33] from the quadrant
stops [35].
b) Add or remove the shims [34] laminations.
c) Install the fillers [33], bolts [36], washers [37], and nuts [38] to the quadrant stops
[35].
(c) Remove rig pin R-4.
SUBTASK 27-21-51-480-005
(11) Install rig pin R-3 in the forward rig pin hole of the captain’s rudder forward quadrant.
SUBTASK 27-21-51-480-006
(12) Install rig pin R-4 in the forward rig pin hole of the first officer’s rudder forward quadrant.
SUBTASK 27-21-51-420-005
(13) Connect the adjustment shaft [75] to the rudder forward quadrant [39]:
(a) Put the adjustment shaft [75] into the rudder forward quadrant’s universal joint [39].
NOTE: The slot in the adjustment shaft must engage with the pin in the hole.
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
GUN ALL 27-21-51
Page 419
Jun 10/2005
D633A101-GUN
BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details
SUBTASK 27-21-51-420-006
(14) Install the bolts [71], washers [72], and nuts [73] to attach the adjustment shaft support bracket
[74] to the structure.
SUBTASK 27-21-51-420-013
(15) Install the bolts [88], washers [89], and nuts [90] to attach the cover assembly [87] to the floor
beam structure.
SUBTASK 27-21-51-860-002
(16) Do these steps to put the rudder pedals to the neutral position:
(a) Turn the adjustment crank clockwise for the rudder pedals to the full forward position.
(b) Turn the adjustment crank back four turns from the full forward position, to get to the
neutral position.
SUBTASK 27-21-51-820-004
(17) Do this task: Rudder Pedals Adjustment, TASK 27-21-00-820-807-001 or Rudder Pedals
Adjustment, TASK 27-21-00-820-807-002.
SUBTASK 27-21-51-420-007
(18) Connect the bus rod [50] to the rudder forward quadrant [39]:
(a) Remove the bolt [45] from the bus rod [50].
(b) Turn the bus rod two full turns to make it shorter.
(c) Make sure you can see the threads of the two bus rod ends through the holes in the bus
rod.
(d) Install the bolt [45], spacers [46], washer [47], nut [48], and pin [49] to connect the bus rod
[50] to the rudder forward quadrant [39].
SUBTASK 27-21-51-420-008
(19) Install the bolt [30], washer [31], and cable retainer [32] to connect the applicable rudder cable to
the rudder forward quadrant [39].
SUBTASK 27-21-51-420-009
(20) Tighten the turnbuckle [91] until cable RA or RB are not loose. (Figure 403)
G. Put the Airplane Back to Its Usual Condition
SUBTASK 27-21-51-420-010
(1) For the first officer’s rudder forward quadrant, install the rudder pedal position sensor. To install
it, do this task: Rudder Pedal Position Sensor Installation, TASK 31-31-42-400-801.
SUBTASK 27-21-51-080-005
(2) Remove the rig pins R-5 from the rudder feel and centering unit (Figure 401).
SUBTASK 27-21-51-080-006
(3) Remove the rig pins R-3 and R-4.
SUBTASK 27-21-51-820-005
(4) Adjust the rudder control cables RA and RB. To adjust them, do this task: Rudder Control
Cables RA and RB Adjustment, TASK 27-21-00-820-808-001 or Rudder Control Cables RA
and RB Adjustment, TASK 27-21-00-820-808-002.
SUBTASK 27-21-51-860-003
(5) Do this task: Put the Rudder Systems A, B, and Standby Back to the Condition Before the
Pressure Removal, TASK 27-21-00-840-802.
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
GUN ALL 27-21-51
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL飞机维护手册2(95)