曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
Interior Application - D5026NS or ZC-026
D. Location Zones
Zone Area
133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station
727.00 - Left
E. Procedure
SUBTASK 27-21-94-020-005
(1) Make sure that the manual override lever [2] on the rudder valve motor [4] is in position 2.
SUBTASK 27-21-94-420-001
(2) Put the rudder valve motor [4] on the shutoff valve [1].
(a) Make sure the rudder valve motor [4] is engaged with the valve cam [3].
SUBTASK 27-21-94-420-002
(3) Install the screws [6] which attach the rudder valve motor [4] to the shutoff valve [1].
SUBTASK 27-21-94-210-001
(4) Before you connect the electrical connector [5], examine the connector for corrosion.
WARNING: DO THE STEPS BELOW IF THE AIRPLANE OPERATES AT AIRPORTS WHERE
DEICING FLUID THAT CONTAIN POTASSIUM FORMATE IS USED. ALSO DO THE
STEPS FOR ALL AIRPLANES THAT YOU FOUND CORROSION IN THE
ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL. THE ELECTRICAL
CONNECTOR IS PART OF A SYSTEM THAT IS NECESSARY FOR SAFE FLIGHT.
(a) If there was corrosion, refer to (SWPM 20-60-03) to correct the problem.
(b) Apply the D5026NS or ZC-026 compound, G50171 to the connector (SWPM 20-60-03).
SUBTASK 27-21-94-420-003
(5) Connect the electrical connector [5] to the rudder valve motor [4].
SUBTASK 27-21-94-860-003
(6) Do this task: Put the Rudder Systems A, B, and Standby Back to the Condition Before the
Pressure Removal, TASK 27-21-00-840-802.
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
GUN ALL 27-21-94
Page 206
Oct 10/2005
D633A101-GUN
BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details
SUBTASK 27-21-94-860-016
(7) Remove the safety tags and close these circuit breakers:
F/O Electrical System Panel, P6-2
Row Col Number Name
C 11 C00362 FLIGHT CONTROL SHUTOFF VALVES STBY RUD
C 13 C01074 FLIGHT CONTROL SHUTOFF VALVES FLT CONT
SUBTASK 27-21-94-730-001
(8) Do this task: Standby Rudder PCU Shutoff Valve Installation Test, TASK 27-21-94-710-801.
------------------------- END OF TASK ---------------------------
TASK 27-21-94-000-802
4. Standby Rudder PCU Shutoff Valve Removal
(Figure 201)
A. General
(1) This task provides instructions to remove the shutoff valve (with the rudder valve motor
attached) from the standby flight controls hydraulic module.
B. References
Reference Title
27-21-00-800-802 Remove Pressure from the Rudder Hydraulic Systems A, B, and
Standby (P/B 201)
C. Location Zones
Zone Area
133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station
727.00 - Left
D. Prepare for the Removal
SUBTASK 27-21-94-860-004
(1) Do this task: Remove Pressure from the Rudder Hydraulic Systems A, B, and Standby,
TASK 27-21-00-800-802.
SUBTASK 27-21-94-860-005
(2) Open these circuit breakers and install safety tags:
F/O Electrical System Panel, P6-2
Row Col Number Name
C 11 C00362 FLIGHT CONTROL SHUTOFF VALVES STBY RUD
C 13 C01074 FLIGHT CONTROL SHUTOFF VALVES FLT CONT
E. Shutoff Valve Removal
SUBTASK 27-21-94-020-006
(1) Disconnect the electrical connector [5] from the rudder valve motor [4].
SUBTASK 27-21-94-020-007
(2) Remove the lockwires from the screws [13].
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
GUN ALL 27-21-94
Page 207
Oct 10/2005
D633A101-GUN
BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details
SUBTASK 27-21-94-020-008
(3) Remove the screws [13] and washers [12] which attach the shutoff valve [1] to the standby flight
controls hydraulic module [9].
SUBTASK 27-21-94-020-009
CAUTION: DO NOT LET HYDRAULIC FLUID GET ON EQUIPMENT. IF HYDRAULIC FLUID GETS ON
EQUIPMENT, IMMEDIATELY CLEAN IT FROM THE EQUIPMENT. HYDRAULIC FLUID
CAN CAUSE DAMAGE TO EQUIPMENT.
(4) Put a container below the shutoff valve [1] to catch hydraulic fluid.
SUBTASK 27-21-94-020-010
(5) Carefully turn and pull directly up on the shutoff valve [1] to remove it from the standby flight
controls hydraulic module [9].
SUBTASK 27-21-94-020-011
(6) Put a cover on the standby flight controls hydraulic module [9] to keep dirt out.
------------------------- END OF TASK ---------------------------
TASK 27-21-94-400-802
5. Standby Rudder PCU Shutoff Valve Installation
(Figure 201)
A. General
(1) This task provides instructions to install the shutoff valve (with the rudder valve motor attached)
to the standby flight controls hydraulic module.
B. References
Reference Title
12-12-00-610-801 Hydraulic Reservoir Servicing (P/B 301)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL飞机维护手册2(121)