(2) Put the Rudder Hydraulic Systems A, B, and Standby Back to the Condition Before the
Pressurization
(3) Remove Pressure from the Rudder Hydraulic Systems A, B and Standby
(4) Put the Rudder Hydraulic Systems A, B, and Standby Back to Condition Before the Pressure
Removal.
B. Hydraulic systems A, B, and standby must have pressure removed before maintenance is done on
the rudder control system. This is to prevent injury to persons because of accidental operation of the
control system while you do maintenance. You must be careful to put maintenance stands and
equipment away from control surface travel.
C. Electric pump 1 pressurizes the hydraulic system B and electric pump 2 pressurizes the hydraulic
system A. Electric pump 1 heat exchanger is installed in the fuel tank 2. Electric pump 2 heat
exchanger is installed in the fuel tank 1.
D. This procedure operates the electric hydraulic system A or B pumps to pressurize the hydraulic
systems A and B. Pressurization of the hydraulic systems with the engine-driven hydraulic pumps is
not included in this procedure.
TASK 27-21-00-800-801
2. Rudder Hydraulic System A, B, or Standby Pressurization
(Figure 201)
A. References
Reference Title
12-12-00-610-801 Hydraulic Reservoir Servicing (P/B 301)
24-22-00-860-811 Supply Electrical Power (P/B 201)
32-00-01-480-801 Landing Gear Downlock Pins Installation (P/B 201)
B. Location Zones
Zone Area
133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station
727.00 - Left
134 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station
727.00 - Right
210 Subzone - Control Compartment - Body Station 178.00 to Body
Station 259.50
C. Procedure
SUBTASK 27-21-00-860-001
(1) Do this task: Supply Electrical Power, TASK 24-22-00-860-811.
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
GUN ALL 27-21-00
Page 201
Oct 10/2003
D633A101-GUN
BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details
SUBTASK 27-21-00-860-002
CAUTION: DO NOT OPERATE THE SYSTEM A OR B HYDRAULIC PUMPS FOR MORE THAN TWO
MINUTES WITHOUT FUEL IN THE FUEL TANKS. THE NO. 1 (FOR SYSTEM A) AND NO.
2 (FOR SYSTEM B) FUEL TANKS MUST HAVE A MINIMUM OF 250 GALLONS (1675
POUNDS/760 KILOGRAMS) OF FUEL IN THEM. IF THERE IS NOT SUFFICIENT FUEL IN
THE FUEL TANKS, THE HYDRAULIC SYSTEMS WILL BECOME TOO HOT.
(2) Make sure the No. 1 and No. 2 fuel tanks each have 250 gallons (1675 pounds/760 kilograms) of
fuel in them.
SUBTASK 27-21-00-210-001
(3) Make sure the hydraulic reservoirs are full. To fill the reservoirs, do this task: Hydraulic
Reservoir Servicing, TASK 12-12-00-610-801.
SUBTASK 27-21-00-860-065
(4) Make sure that these circuit breakers are closed:
F/O Electrical System Panel, P6-2
Row Col Number Name
B 13 C00363 FLIGHT CONTROL SHUTOFF VALVES FLT CONT
C 11 C00362 FLIGHT CONTROL SHUTOFF VALVES STBY RUD
C 13 C01074 FLIGHT CONTROL SHUTOFF VALVES FLT CONT
SUBTASK 27-21-00-860-004
(5) Set the parking brake.
SUBTASK 27-21-00-480-001
WARNING: MAKE SURE THAT THE GROUND LOCKS ARE INSTALLED IN ALL OF THE LANDING
GEAR BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEMS. WITHOUT THE
GROUND LOCKS, THE LANDING GEAR CAN RETRACT AND CAUSE INJURIES TO
PERSONS AND DAMAGE TO EQUIPMENT.
(6) Install the ground lock assemblies in the nose gear. To install them, do this task: Landing Gear
Downlock Pins Installation, TASK 32-00-01-480-801.
SUBTASK 27-21-00-860-005
WARNING: KEEP PERSONS AND EQUIPMENT CLEAR OF THE FLIGHT CONTROL SURFACES.
THESE COMPONENTS CAN MOVE SUDDENLY WHEN YOU SUPPLY HYDRAULIC
POWER. THIS CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT.
(7) Pressurize the rudder hydraulic system A, B or Standby (Figure 201):
(a) Set the ELEC 2, HYD PUMPS A or ELEC 1, HYD PUMPS B switch on the forward overhead
panel to the ON position.
NOTE: Intermittent system A or B electric pump operation must be kept to a limit of five
starts in a 5 minutes period. After the fifth start, operate the pump for more than 5
minutes or turn the pump off for a minimum of 5 minutes.
(b) For the hydraulic system A pressurization, set the FLT CONTROL A switch on the forward
overhead panel to the ON position.
(c) For the hydraulic system B pressurization, set the FLT CONTROL B switch on the forward
overhead panel to the ON position.
(d) For the standby hydraulic system, set the FLT CONTROL A or B switch on the forward
overhead panel to the STDBY RUD position.
------------------------- END OF TASK ---------------------------
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL飞机维护手册2(17)