• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-13 08:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 34-31-00
 ALL  ú
 ú  02  Page 102
 ú  Jun 10/89 

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL
NOSE RADOME SEE

 

Instrument Landing System - Component Location
Figure 102 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-31-00
 ALL  ú ú 01 Page 103 ú Jun 10/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL


LEFT, RIGHT OR CENTER ILS RECEIVER,
B620, B628 OR B7439


Instrument Landing System - Component Location
Figure 102 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-31-00
 ALL  ú
 ú  15  Page 104
 ú  Jun 18/00 

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
L33757
A
747-400 FAULT ISOLATION/MAINT MANUAL
C/L DUAL G/S TRACK ANTENNA, B559
FWD
LEFT AFT NOSE GEAR DOOR
C
R DUAL G/S
TRACK
ANTENNA, B561

P7 PANEL
FWD
RIGHT AFT NOSE GEAR DOOR
D
FLT COMPT
Instrument Landing System - Component Location
Figure 102 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-31-00
 ALL  ú ú 02 Page 105 ú Feb 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 INSTRUMENT LANDING SYSTEM - ADJUSTMENT/TEST
___________________________________________
 1.  General_______
 A.  This subject has three tasks. The first task is an operational test of the instrument landing system (ILS). The second task is a ground test of the ILS. The third task is a system test of the ILS.
 TASK 34-31-00-715-001
 2.  Operational Test - Instrument Landing System____________________________________________
 A.  General
 (1)  
The operational test does not use external test equipment and thus it can do a system check quickly. This task uses the audio control panel (ACP) to do the operational test.

 (2)  
This task contains these two procedures:

 (a)  
Prepare for the Operational Test

 (b)  
Audio Test.

 


 B.  References
 (1)  
AMM 23-51-00/501, Flight Interphone System

 (2)  
AMM 24-22-00/201, Manual Control

 (3)  
AMM 31-61-00/501, Integrated Display System

 (4)  
AMM 34-61-02/401, Control Display Unit


 C.  Access
 (1)  Location Zone
 221 Control Cabin, LH
 222 Control Cabin, RH

 D.  Preconditions
 S 865-259
 (1)  These conditions are necessary for this task:
 (a)  
Electrical Power on (AMM 24-22-00/201).

 (b)  
Integrated Display System (IDS), serviceable (AMM 31-61-00/501).

 (c)  
Flight Interphone System, serviceable (AMM 23-51-00/501).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-31-00
 ALL  ú ú 01 Page 501 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (d)  Control Display Unit (CDU), installed (AMM 34-61-02/401).
 E.  Prepare for the Operational Test
 S 865-260
 (1)  Make sure these circuit breakers are closed:
 (a)  P7 Overhead Circuit Breaker Panel
 1) 7A6 NAV RADIO MMR L
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 导航 NAVIGATION 2(33)