• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-13 08:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (b)  Right R/T mount: 1) Put the left R/T mount on shelf assembly E5-2 between station 200 and 220. 2) Install the four screws, washers and nuts which attach the
 R/T mount to the shelf assembly E5-2. 3) Install connector DB140 into the R/T mount. 4) Install two top and two bottom screws, nuts and washers to
 attach connector DB140 to the R/T mount.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-43-05
 ALL  ú ú 04A Page 418 ú Jun 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 5)  Install all ground wires into ground terminal GBD140 on the R/T mount using an insertion/extraction tool. (SWPM 20-20-11)
 NOTE: Use the insertion/extraction tool for a Burndy
____ terminal block with part number YHLZG8-1.
 (c)  Install the four screws and washers and a gasket to attach the left or right feeder waveguide to the R/T mount waveguide.
 CAUTION: BE CAREFUL TO PREVENT DAMAGE TO THE WAVEGUIDE SWITCH
_______ WHEN THE SCREWS ARE TIGHTENED. IF YOU TIGHTEN THE SCREWS TOO MUCH, DAMAGE TO THE WAVEGUIDE SWITCH CAN OCCUR.
 (d)  
Make sure the four screws and washers that hold both feeder waveguides to the waveguide switch are correctly attached.

 (e)  
Connect the electrial connector DB139 to the blower assembly.

 (f)  
Make sure the R/T mount wire bundle is not damaged and is correctly attached to the R/T mount and E5 shelf assembly.


 S 414-042
 (5)  
Do this task to install the left WXR R/T in the E5-1 shelf assembly: Weather Radar Receiver/Transmitter Removal (AMM 34-43-02/401).

 S 414-043

 (6)  
Do this task to install the right WXR R/T in the E5-2 shelf
 assembly: Weather Radar Receiver/Transmitter Installation
 (AMM 34-43-02/401).

 

 F.  Weather Radar System Test
 S 864-044
 (1) Remove the DO-NOT-CLOSE tags and close these circuit breakers:
 (a)  P7 Overhead Circuit Breaker Panel
 1) 7C7 WXR L RT
 2) 7C19 WXR R RT

 S 864-046
 (2)  Do this task to supply electrical power: Manual Control
 (AMM 24-22-00/201).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-43-05
 ALL  ú ú 04A Page 419 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 747-400 MAINTENANCE MANUAL
 (3)  S 714-056Do this task to test the WXR R/T mount: Adjustment/Test (AMM 34-43-00/501). Weather Radar System -
(4)  S 414-059PASSENGER AIRPLANES; Close the access door to the 117A electronics compartment (AMM 06-09-01/201).
 (5)  S 414-146FREIGHTERS; Install the floor cargo panels on the floor beams above the receiver/transmitters.
 WARNING:_______ STEP ONLY ON THE FLOOR BEAMS WHEN YOU REMOVE CARGO FLOOR PANEL. THE FLOOR PANELS BETWEEN THE BEAMS CAN FLEX AND CAUSE TO YOU FALL. IF YOU DO NOT OBEY THESE INSTRUCTIONS, INJURY TO PERSONNEL AND/OR DAMAGE TO THE WEATHER RADAR EQUIPMENT OR BLANKET MATERIAL CAN OCCUR.
 WARNING:_______ THE CARGO FLOOR PANEL IS HEAVY. TO PREVENT INJURY, TWO PEOPLE ARE REQUIRED WHEN LIFTING OR MOVING THE CARGO FLOOR PANEL.
 CAUTION:_______ DO NOT PUSH OR PULL THE CARGO FLOOR PANEL ACROSS THE FLOOR BEAMS. THIS ACTION CAN CAUSE DAMAGE TO THE BLANKET MATERIAL.
 (a) (b)  Carefully install the cargo floor panel.Tighten all 18 fasteners that hold the cargo floor panel.
 (6)  S 864-050If electrical power is not necessary, do this task to remove electrical power: Manual Control (AMM 24-22-00/201).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-43-05
 ALL  ú ú 05A Page 420 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 WEATHER RADAR WAVEGUIDE SWITCH - REMOVAL/INSTALLATION
_____________________________________________________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 导航 NAVIGATION 2(149)