34-43-00
 ALL  ú ú 06 Page 101 ú Feb 18/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 FAULT ISOLATION/MAINT MANUAL 
NOSE RADOME, 111AL 
WEATHER RADAR ANTENNA, B143 
SEE A 
MAIN EQUIPMENT 
CENTER ACCESS 
DOOR, 117AL
WEATHER RADAR ANTENNA, B143 
A 
LEFT RECEIVER/ TRANSMITTER, B138
SEE C 
RIGHT RECEIVER/ R/T MOUNT, B139TRANSMITTER, B140 
SEE C 
EQUIPMENT 
RACK, E30 
SEE B 
WAVEGUIDE SWITCH, B139 
EQUIPMENT RACK, E30 
B 
Weather Radar System - Component Location 
Figure 102 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. PASSENGER AIRPLANES ú
 34-43-00
 ú ú 08 Page 102 ú Feb 18/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
747-400 FAULT ISOLATION/MAINT MANUAL  
ASSEMBLY, E5 SHELF  
SEE  B  
111AL NOSE RADOME, 
FWD  
WEATHER RADAR  WEATHER RADAR  
ANTENNA, B143  ANTENNA, B143  
SEE  A  RIGHT RECEIVER/  A  
TRANSMITTER, B140  
SEE  C  SHT 3  
LEFT RECEIVER/  
TRANSMITTER, B138  
SEE  C  SHT 3  
SHELF  
ASSEMBLY, E5-2 
WAVEGUIDE 
RECEIVER/TRANSMITTER MOUNTSWITCH, B139 
SHELF ASSEMBLY, E5-1FWD 
WAVEGUIDE TO 
ANTENNA
SHELF ASSEMBLY, E5 
B 
Weather Radar System - Component Location Figure 102 (Sheet 2) 
D22123
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTER AIRPLANES ú
 34-43-00
 ú ú 13 Page 103 ú Feb 18/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
747-400 FAULT ISOLATION/MAINT MANUAL 
P7 PANEL 
LEFT,RIGHT RECEIVER/TRANSMITTER, B138, B140 (RDR-4A) 
C 
P8 PANEL  WEATHER RADAR 
CONTROL PANEL, B142
SEE D 
FLIGHT COMPARTMENT 
LEFT,RIGHT RECEIVER/TRANSMITTER, B138, B140 (RDR-4B) 
C 
SYS  WX  WX RADAR  
L  R  TEST  WX/TURB  TILT  
MAP  +5  +10  
GAIN  +  +15 
0 
AUTO MAX -15 -5 -10 
WEATHER RADAR CONTROL PANEL, B142 D 
Weather Radar System - Component Location Figure 102 (Sheet 3) 
L10313
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 34-43-00
 ALL  ú ú 03 Page 104 ú Feb 18/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 WEATHER RADAR SYSTEM - ADJUSTMENT/TEST
______________________________________
 1.  General_______
 A.  This subject contains four tasks: the operational test, the ground test, the system test and the system shutdown procedure. The operational test uses the self test circuits to make sure the weather radar system is servicable. The ground test uses the CMC and the CDU to make sure the weather radar system is serviceable. The system test makes sure all functions of the weather radar operate correctly. The system shutdown procedure is used to set the weather radar system and other related airplane equipment back to their usual condition.
 TASK 34-43-00-715-001
 2.  Operational Test - Weather Radar System_______________________________________
 A.  General
 (1)  
The operational test has these parts:
 (a)  
The prepare for a weather radar operational test.
 (b)  
The weather radar system self test.
 (c)  
The test of the controls on the indicators.
 (d)  
The test of the antenna TILT control on the WXR control panel
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 导航 NAVIGATION 2(107)