• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-13 08:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Connect the electrial connector DB139 to the waveguide switch.

 (s)  
Connect all ten wire bundle connectors to the correct mating connector on the AEO 302 disconnect panel.


 NOTE: See Detail B for the correct mating connectors
____ on the disconnect panel.
 (t)  
Install the air hose to the left air inlet on the R/T mount.

 (u)  
Tighten the air hose clamp to the left hose and air inlet.

 (v)  
Install the air hose to the right air inlet on the R/T mount.

 (w)  
Tighten the air hose clamp to the right hose and air inlet.


 S 414-033
 (11)
 Do this task to install the left WXR R/T in the E30 rack:  Weather Radar Receiver/Transmitter Removal (AMM 34-43-02/401).

 S 414-034

 (12)
 Do this task to install the right WXR R/T in the E30 rack:  Weather Radar Receiver/Transmitter Installation (AMM 34-43-02/401).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-43-05
 ALL  ú ú 04A Page 416 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 414-035
 (13) Do this task to install the main static inverter in the E30 rack: Main Inverter Installation (AMM 24-29-01/401).
 TASK 34-43-05-404-037
 5.  FREIGHTERS; Weather Radar R/T Mount Installation (Fig. 401A)
____________________________________
 A.  General
 (1)  The R/T mount for the left R/T (B138) is attached to the E5-1 shelf assembly below the floor compartment between station 180 and 200. The R/T mount for the right R/T(B140) is attached to the E5-2 shelf assembly below the floor compartment between station 200 and 220. To install the left or right R/T mount, you must electrically and mechanically connect it from the E5 shelf assembly.
 B.  Special Tools and Equipment
 NOTE: Use the correct insertion/extraction tool fround in one of the two
____ crimp tool kits shown below. See crimp tool kit connector index.
 (1)  
Graphic Datakits International, Burndy P/N J1276-1
 Insertion/Extraction Tool


 (2)  
Daniels Mfg. Corporation, Astro P/N ATB3062-2
 Insertion/Extraction tool.

 

 C.  References
 (1)  
AMM 34-43-02/401, Weather Radar Receiver/Transmitter

 (2)  
SWPM 20-20-11 Standard Wiring Practices Manual

 (3)  
IPC 34-43-02 Fig. 1


 D.  Access
 (1)  Location Zone 112 Freighter Main Deck - Nose to First Door, Right
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 34-43-05
 ALL  ú ú 04A Page 417 ú Feb 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 E.  Procedure
 S 864-038
 (1)  Make sure these circuit breakers are open with DO-NOT-CLOSE tags attached:
 (a)  P7 Overhead Circuit Breaker Panel
 1) 7C7 WXR L RT
 2) 7C19 WXR R RT

 S 424-069
 (2)  
Remove the cover from the electrical connector sections and
 waveguide section on connector DB138 or DB140.


 S 424-070

 (3)  
Remove the dust cap from the feeder waveguide.

 S 424-041

 (4)  
Install the R/T mount:


 NOTE: Replace the waveguide gaskets when they are defective.
____
 (a)  Left R/T mount: 1) Put the left R/T mount on shelf assembly E5-1 between station 180 and 200. 2) Install the four screws, washers and nuts which attach the
 R/T mount to the shelf assembly E5-1.
 3)  Install connector DB138 into the left R/T mount.
 4)  Install two top and two bottom screws, nuts and washers to
 attach connector DB138 to the R/T mount.
 5)  Install all ground wires into ground terminal GDB138 on the R/T mount using an insertion/extraction tool. (SWPM 20-20-11)
 NOTE: Use the insertion/extraction tool for a Burndy
____ terminal block with part number YHLZG8-1.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 导航 NAVIGATION 2(148)