(s)  
Connect all ten wire bundle connectors to the correct mating connector on the AEO 302 disconnect panel.
 NOTE: See Detail B for the correct mating connectors
____ on the disconnect panel.
 (t)  
Install the air hose to the left air inlet on the R/T mount.
 (u)  
Tighten the air hose clamp to the left hose and air inlet.
 (v)  
Install the air hose to the right air inlet on the R/T mount.
 (w)  
Tighten the air hose clamp to the right hose and air inlet.
 S 414-033
 (11)
 Do this task to install the left WXR R/T in the E30 rack:  Weather Radar Receiver/Transmitter Removal (AMM 34-43-02/401).
S 414-034
 (12)
 Do this task to install the right WXR R/T in the E30 rack:  Weather Radar Receiver/Transmitter Installation (AMM 34-43-02/401).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 34-43-05
 ALL  ú ú 04A Page 416 ú Feb 18/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 S 414-035
 (13) Do this task to install the main static inverter in the E30 rack: Main Inverter Installation (AMM 24-29-01/401).
 TASK 34-43-05-404-037
 5.  FREIGHTERS; Weather Radar R/T Mount Installation (Fig. 401A)
____________________________________
 A.  General
 (1)  The R/T mount for the left R/T (B138) is attached to the E5-1 shelf assembly below the floor compartment between station 180 and 200. The R/T mount for the right R/T(B140) is attached to the E5-2 shelf assembly below the floor compartment between station 200 and 220. To install the left or right R/T mount, you must electrically and mechanically connect it from the E5 shelf assembly.
 B.  Special Tools and Equipment
 NOTE: Use the correct insertion/extraction tool fround in one of the two
____ crimp tool kits shown below. See crimp tool kit connector index.
 (1)  
Graphic Datakits International, Burndy P/N J1276-1
 Insertion/Extraction Tool
 (2)  
Daniels Mfg. Corporation, Astro P/N ATB3062-2
 Insertion/Extraction tool.
 C.  References
 (1)  
AMM 34-43-02/401, Weather Radar Receiver/Transmitter
 (2)  
SWPM 20-20-11 Standard Wiring Practices Manual
 (3)  
IPC 34-43-02 Fig. 1
 D.  Access
 (1)  Location Zone 112 Freighter Main Deck - Nose to First Door, Right
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 34-43-05
 ALL  ú ú 04A Page 417 ú Feb 18/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 E.  Procedure
 S 864-038
 (1)  Make sure these circuit breakers are open with DO-NOT-CLOSE tags attached:
 (a)  P7 Overhead Circuit Breaker Panel
 1) 7C7 WXR L RT
 2) 7C19 WXR R RT
 S 424-069
 (2)  
Remove the cover from the electrical connector sections and
 waveguide section on connector DB138 or DB140.
 S 424-070
 (3)  
Remove the dust cap from the feeder waveguide.
S 424-041
 (4)  
Install the R/T mount:
 NOTE: Replace the waveguide gaskets when they are defective.
____
 (a)  Left R/T mount: 1) Put the left R/T mount on shelf assembly E5-1 between station 180 and 200. 2) Install the four screws, washers and nuts which attach the
 R/T mount to the shelf assembly E5-1.
 3)  Install connector DB138 into the left R/T mount.
 4)  Install two top and two bottom screws, nuts and washers to
 attach connector DB138 to the R/T mount.
 5)  Install all ground wires into ground terminal GDB138 on the R/T mount using an insertion/extraction tool. (SWPM 20-20-11)
 NOTE: Use the insertion/extraction tool for a Burndy
____ terminal block with part number YHLZG8-1.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 导航 NAVIGATION 2(148)