• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-11 09:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

TUBE A
TUBE B
RETAINER HALVES RETAINING RINGS
C-C
COUPLING O-RING
NUT
TUBE B
FERRULE
TUBE A
O-RING
RETAINING RING
COUPLING
RETAINER HALVES
EXPLODED VIEW
RETAINING RING
FLEXIBLE FULL COUPLING
Fuel Tube Coupling Installation
Figure 201 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 28-00-00
 ALL  ú ú 01 Page 207 ú Oct 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL


A MAXIMUM

GAGING
ST8709H
RANGE
FERRULE

RETAINING RING
FLEXIBLE COUPLING WITH COUPLING GAGE
TUBE SIZE (in.) NOMINAL  COUPLING SIZE  GAGE MAX.  GAGE MIN.  ST8709H NO. GAGE 
0.50  -8  0.59  0.47  1 
0.625  -10  0.59  0.47  1 
0.75  -12  0.69  0.55  2 
1.00  -16  0.75  0.60  3 
1.25  -20  0.75  0.60  3 
1.50  -24  0.93  0.76  4 
1.75  -28  0.93  0.76  4 
2.00  -32  0.93  0.76  4 
2.25  -36  0.93  0.76  4 
2.50  -40  0.93  0.76  4 
3.00  -48  0.93  0.76  4 
3.50  -56  1.03  0.88  5 
4.00  -64  1.03  0.88  5 
4.50  -72  1.16  0.99  6 
5.00  -80  1.39  1.22  7 
5.50  -88  1.39  1.22  7 

DIMENSIONAL REQUIREMENTS FOR ASSEMBLING FLEXIBLE FULL COUPLING FLEXIBLE FULL COUPLING DIMENSIONS Coupling Installation Figure 202
 F81027
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 28-00-00
 ALL  ú ú 01 Page 208 ú Oct 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 TASK 28-00-00-402-015
 4.  Connect the Flexible Half Coupling (Fig. 201)__________________________________
 A. References
 (1)  
AMM 28-22-07/601, Engine Fuel System Fuel Line

 B.
Consumable Materials

 (1)  
D00128 Petrolatum - Technical, VV-P-236

 C.
Fuel Coupling Inspection


 S 212-044
 (1)  
Inspect the tube ferrule(s), coupling nut(s) and retaining ring(s) for damage.

 (a)  
If there is damage, make sure the damage or wear is within the permitted limit (AMM 28-22-07/601).


 S 212-097
 (2)  
Do these steps to check the installation of the fuel couplings:

 (a)  
Make sure the O-rings are new and are not contaminated or damaged.

 (b)  
Make sure the O-rings are lubricated with petrolatum before the installation.

 (c)  
Make sure the retaining rings are new and are not deformed or bent.

 (d)  
Make sure all of the coupling components are installed and in the correct sequence.

 (e)  
Make sure the coupling is manually tightened.

 (f)  
Make sure the coupling is tightened as far as possible by hand.

 D.
Procedure


 S 432-016
 (1)  Put the coupling nut on the ferrule.
 S 432-017
 CAUTION:_______DO NOT CAUSE THE RING TO BE OUT OF ITS CORRECT SHAPE. IT CAN CAUSE PERMANENT DAMAGE TO THE RING AND RESULT IN LEAKS AT THE COUPLING.
 (2)  
Put a retaining ring on the ferrule to keep the nut on the tube.

 (3)  
Lubricate the new O-ring with petrolatum.

 (4)  
Put the O-ring on the ferrule.


 S 642-018
 S 432-039
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 28-00-00
 ALL  ú ú 01 Page 209 ú Oct 10/97
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 燃油 FUEL 1(8)