• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-11 09:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (7)
After you have installed all of the tools go out of the main tank.


 S 486-298
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-11-00
 ALL  ú ú 07 Page 650 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 J.  Prepare the Inboard Main Tank (No. 2 or 3) for the Pressure Check (Table 604)
 S 016-377
 (1)  
Open the applicable No. 2 or 3 main tank access doors
 (AMM 28-11-02/401):


 (a)  
No. 2 main tank:
 1) 544AB
 2) 545BB


 (b)  
No. 3 main tank:
 1) 644AB
 2) 645BB

 

 S 016-378
 (2)  
Install tooling in the inboard vent line (View K):

 (a)  
Go into the main tank through the applicable access door: 1) 544AB No. 2 main tank 2) 644AB No. 3 main tank

 (b)  
Go inboard and forward of the mid spar to the vent line (WS 280, WBL 145). 1) Remove the coupling from the vent line. 2) Install a G28019-19 vent plug into the aft section of the

 vent tube.

 (c)  
Go inboard and aft of the mid spar to the vent line (WS 323, WBL 145). 1) Install a G28019-5 stopper into the bottom of the drain


 valve.
 S 486-379
 (3)  
AIRPLANES WITH A HYDROMECHANICAL FUEL SCAVENGE SYSTEM; Install tooling in the scavenge system float valve, aft of the mid spar (View L):

 (a)  
Go into the main tank through the applicable access door: 1) 544AB No. 2 main tank 2) 644AB No. 3 main tank

 (b)  
Go inboard and aft of the mid spar (WS 330, WBL 50).

 (c)  
Install a G28019-4 float clamp assembly (sponge) on top of the fuel scavenge system float valve.


 S 486-380
 (4)  
Install tooling in the outboard vent line (View H):

 (a)  
Go into the main tank through the applicable access door: 1) 545BB No. 2 main tank 2) 645BB No. 3 main tank

 (b)  
Go forward through the mid spar access hole (WS 680, WBL 470).

 (c)  
Install a G28019-4 float clamp (sponge) on top of each float valve (two locations).

 (d)  
Install a G28019-5 stopper into the bottom of the drain valve (WS 690, WBL 470)(View E).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 28-11-00
 ALL  ú ú 07 Page 651 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 486-381
 (5)  
Install tooling in the channel float valves (View I):

 (a)  
Go into the main tank through the applicable access door: 1) 545BB No. 2 main tank 2) 645BB No. 3 main tank

 (b)  
Go aft of the mid spar to the outboard tank end (LWS 733, RWS 741).

 (c)  
Install a G28019-4 float clamp (sponge) on top of each float valve (two locations).

 (d)  
Install a G28019-5 stopper into the bottom of each drain valve (two locations).


 S 486-382
 (6)  
Install tooling in the drain valve (View E):

 (a)  
Go into the main tank through the applicable access door: 1) 545BB No. 2 main tank 2) 645BB No. 3 main tank

 (b)  
Go outboard and aft of the mid spar to the outboard tank end (WS 760, WBL 470).

 (c)  
Install a G28019-5 stopper into the drain valve.


 S 866-383
 (7)  After you have installed all of the tools go out of the fuel tank.
 ~.............................................................................. | | | WING FUEL TANK | | QTY | | TOOL NUMBER | NOMENCLATURE | ACCESS DOOR | LOCATION | (PER TANK) | ................................................................................ |F72951-1 |U-TUBE WATER | N/A |ALL TANKS | 1 | | |MANOMETER | | | | ................................................................................ |G28019-18 |PRESSURE TEST | AS NECESSARY |FUEL TANK | 1 | | |DOOR | |UNDER TEST | | ................................................................................
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 燃油 FUEL 1(75)