EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-52-21
ALL ú ú 03 Page 303 ú Nov 15/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / GTCP85-129 SERIES /737-300/400/500/ ENGINES/MAINTENANCE MANUAL ////////////////////////
S 433-009
(8) Install a new lock-o-seal and retainer washer on the pressure
regulator housing.
S 423-010
(9) Install the pressure regulator filter in the cover for the pressure
regulator housing:
(a) Put the pressure regulator filter in the cover.
(b) Put a new packing on the pressure regulator filter in the
cover.
S 433-011
(10) Install the cover on the pressure regulator housing:
(a)
Install the cover on the pressure regulator housing.
(b)
Tighten the cover for the pressure regulator housing to 75-85 pound-inches (8.5-9.6 N.m).
S 433-012
CAUTION: DO NOT TIGHTEN THE AIR INLET LINE FOR THE PRESSURE REGULATOR
_______ MORE THAN 65 POUND-INCHES (7.3 N.M). THE FITTING WILL BREAK FROM THE COVER FOR THE PRESSURE REGULATOR HOUSING.
(11) Connect the air inlet line to the pressure regulator and to the bleed air valve:
(a)
Connect the air inlet line.
(b)
Install the clamp for the air inlet line.
S 783-013
(12)
Do the test of the pressure regulator (AMM 49-52-21/501).
S 413-014
(13)
Close the APU cowl door:
(a) Disconnect the door support rods.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-52-21
ALL ú ú 01 Page 304 ú Nov 15/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
(b)
Put the door support rods in the clips on the APU cowl door.
(c)
Close the APU cowl door.
(d)
Close the latches for the APU cowl door.
S 863-015
(14) Set the circuit breaker and the switch:
(a)
Remove the DO-NOT-CLOSE tag and close this circuit breaker: 1) E3-3 Electrical Shelf, APU Control Unit
(b)
Remove the DO-NOT-OPERATE tag from the APU master switch on the P5 forward overhead panel.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-52-21
ALL ú ú 01 Page 305 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
DIFFERENTIAL AIR PRESSURE REGULATOR - REMOVAL/INSTALLATION
__________________________________________________________
1. General
_______
A. This procedure contains the removal and the installation tasks for the regulator for the differential air pressure. During this procedure, the regulator is referred to as the differential pressure regulator.
B. The differential pressure regulator is attached to the bleed air duct in the APU compartment. You can get access to the regulator through the APU cowl door.
TASK 49-52-21-004-001
2. Differential Pressure Regulator Removal (Fig. 401)
_______________________________________
A. Access
(1)
Location Zones
101 Control Cabin, LH
205 Electronic Compartment
703 APU Compartment
(2)
Access Panels
1201 Electronic Equipment Access Door
3804 APU Cowl Door
B. Procedure
S 864-002
(1) Set the switch and the circuit breaker:
(a)
Set the APU master switch, on the P5 forward overhead panel, to the OFF position and attach a DO-NOT-OPERATE tag.
(b)
Open this circuit breaker and attach a DO-NOT-CLOSE tag: 1) E3-3 Electrical Shelf, APU Control Unit
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 AIRBORNE AUXILIARY POWER 2(83)