(2)
Access Panel
1201 Electronic Equipment Access Door
3804 APU Cowl Door
B. Procedure
S 864-002
(1) Set the switch and the circuit breaker:
(a)
Set the APU master switch, on the P5 forward overhead panel, to the OFF position and attach a DO-NOT-OPERATE tag.
(b)
Open this circuit breaker and attach a DO-NOT-CLOSE tag: 1) E3-3 Electrical Shelf, APU Control Unit
S 014-003
(2) Open the APU cowl door:
(a)
Open the latches for the APU cowl door.
(b)
Open the APU cowl door.
(c)
Connect the door support rods.
S 024-004
(3) Remove the check valve:
(a) Disconnect the bleed air line from the check valve.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-31-93
ALL ú ú 01 Page 401 ú Mar 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / GTCP85-129 SERIES /737-300/400/500/ ENGINES /MAINTENANCE MANUAL ////////////////////////
SEEA
SEE B
UPPER SHROUD A
FUEL HEATER
INLET LINE FOR THE BLEED AIR
CHECK VALVE FOR THE FUEL SENSING
BLEED AIR DUCT FLOW CONTROL
B
Fuel Sensing Flow Control Check Valve Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-31-93
ALL ú ú 02 Page 402 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
(b)
Install a cap on the bleed air line.
(c)
Remove the check valve and gasket from the bleed air duct. 1) Discard the gasket.
TASK 49-31-93-404-005
3. Fuel Sensing Flow Control Check Valve Installation (Fig. 401)
__________________________________________________
A. References
(1) AMM 49-11-00/201, APU Power Plant
B. Access
(1)
Location Zones
101 Control Cabin, LH
205 Electronic Compartment
703 APU Compartment
(2)
Access Panels
1201 Electronic Equipment Access Door
3804 APU Cowl Door
C. Procedure
S 424-006
(1) Install the check valve:
(a)
Install a new gasket on the check valve.
(b)
Install the check valve on the boss of the bleed air duct.
NOTE: To install the check valve, make sure the directional
____ flow arrow points away from the bleed air duct.
(c)
Remove the cap from the bleed air line.
(d)
Connect the bleed air line to the check valve.
S 864-007
(2) Set the circuit breaker and the switch:
(a)
Remove the DO-NOT-CLOSE tag and close this circuit breaker: 1) E3-3 Electrical Shelf, APU Control Unit
(b)
Remove the DO-NOT-OPERATE tag from the APU master switch on the P5 forward overhead panel.
S 794-008
(3) APUs WITH ALLIEDSIGNAL SB GTCP85-49-7096;
Examine the check valve for leakage:
(a)
Start and operate the APU (AMM 49-11-00/201).
(b)
During the APU operation, examine the check valve and the air line connection for leakage.
(c)
Do the APU usual shutdown (AMM 49-11-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 AIRBORNE AUXILIARY POWER 2(47)