TASK 49-52-11-404-010
3. Bleed Air Valve Installation (Fig. 401)
____________________________
A. Consumable Materials
(1) D00010 Compound - Antiseize, MIL-A-907, Fel-Pro C-5A
B. References
(1) AMM 49-11-00/501, APU Power Plant
C. Access
(1)
Location Zones
101 Control Cabin, LH
205 Electronic Compartment
701 Tail Section
703 APU Compartment
(2)
Access Panels 1201 Electronic Equipment Access Door 3701 Horizontal Stabilizer Compartment Access Door 3804 APU Cowl Door
D. Procedure
S 424-006
(1) Install the bleed air valve:
(a) Put the bleed air valve and a new packing in their positions between the duct flanges.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-52-11
ALL ú ú 01 Page 403 ú Jul 15/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / GTCP85-129 SERIES /737-300/400/500/ ENGINES/MAINTENANCE MANUAL ////////////////////////
(b)
Apply a layer of the antiseize compound to the clamp bolts.
(c)
Install the clamps that attach the bleed air valve to the ducts. 1) Do not tighten the clamps at this time.
(d)
Align the turnbuckle in the hanger clamp.
(e)
Install the bolt, the washer, and the nut that attach the turnbuckle to the hanger clamp. 1) Tighten the nut to 50 pound-inches (5.7 newton-meters).
(f)
Connect the control line for the bleed air to the bleed air valve.
NOTE: If it is necessary, you can turn the valve to
____
connect the air line.
(g)
Go in the horizontal stabilizer compartment and install the clamp on the airplane pneumatic ducts. 1) Tighten the clamp nut to 50 pound-inches (5.7
newton-meters).
(h)
In the APU compartment, tighten the clamp nuts to 50
pound-inches (5.7 newton-meters).
(i)
Connect the electrical connectors to the bleed air valve. 1) Install lockwires on the electrical connectors.
S 864-007
(2) Set the circuit breakers and the switch:
(a) Remove the DO-NOT-CLOSE tags and close these circuit breakers: 1) E3-3 Electrical Shelf, APU Control Unit 2) P6 Circuit Breaker Panel
a) STAB TRIM 3) Remove the DO-NOT-OPERATE tag from the APU master switch on the P5 forward overhead panel.
S 714-008
(3) Do the APU operation test (AMM 49-11-00/501).
(a) During the APU operation, examine the clamp joints for leakage.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-52-11
ALL ú ú 01 Page 404 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
(b) If you found leakage, repair the cause of it.
S 414-009
(4) Close the access doors:
(a)
Disconnect the support rods for the APU cowl door.
(b)
Put the door support rods in the clips on the APU cowl door.
(c)
Close the APU cowl door.
(d)
Close the latches on the APU cowl door.
(e)
Close the access door for the horizontal stabilizer compartment.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
49-52-11
ALL ú ú 01 Page 405 ú Jul 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
BLEED AIR DUCT - REMOVAL/INSTALLATION
_____________________________________
1. General
_______
A. This procedure gives the tasks to remove and to install the bleed air duct. The bleed air duct is found in the APU compartment between the upper shroud and the bleed air valve.
TASK 49-52-13-004-001
2. Bleed Air Duct Removal (Fig. 401)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 AIRBORNE AUXILIARY POWER 2(79)