• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:11来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-11-08
 ALL  ú ú 01 Page 802 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 MAIN ENTRY DOOR NO. 5 - REMOVAL/INSTALLATION
____________________________________________
 1.  General
_______
 A.  This procedure contains two tasks. The first task is the removal of the door 5. The second task is the installation of the door 5.
 B.  There is more material on the new spare doors to permit the door to be interchangeable. You can cut off the unwanted material during the door installation.
 C.  The front and aft positions of the door are not adjustable, but the vertical and lateral positions are.
 D.  You can do the door installation adjustments with the airplane on its gear and total fuel load of not more than 60,000 pounds. The different between the fuel load on each side of the fuselage must not be more than 5,000 pounds.
 NOTE: You can do the adjustments with one of these configurations of the
____
 airplane lifted on the jacks:

 -
The inboard wing jacks IV and V installed with the load on each jack not more than 30,000 pounds.

 -
The inboard wing jacks IV and V, and the tail jack III installed with the load on each jack not more than 30,000 pounds.

 -
The tail jack III installed with the load on the jack not more than 4,000 pounds.


 TASK 52-11-09-004-001
 2.  Main Entry Door 5 Removal (Figs. 401 to 403)
_________________________
 A.  Special Tools and Equipment
 (1)  
OHME65B01836 Sling, Main Entry Door

 (2)  
12MIT65B00141 Adapter, Torque Wrench

 (3)  
TME65B04308 Dolly, Main Entry Door

 (4)  
12PRE65B00040 Safety Barrier, Entry Door 5 Opening LH and RH

 B.  
References

 (1)  
AMM 25-59-01/401, Main Deck Compartment Cargo Lining Panel

 (2)  
52-11-02/401, Main Entry Door Lining and Insulation

 (3)  
52-11-14/401, Main Entry Door Hinge Flaps

 (4)  
AIPC 52-11-03 Fig. 5, AIPC 52-11-04 Fig. 5, AIPC 52-11-05 Fig. 2, AIPC 52-11-09 Fig. 4, AIPC 52-11-11 Fig. 6, AIPC 52-11-71 Fig. 5

 C.  
Access

 (1)  
Location Zone
 271 Main Deck, Sta 2040 to Sta 2360, LH

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-11-09
 ALL  ú ú 03 Page 401 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 (2)  
Access Panel
 271AL Panel, Access - Door Maintenance (Door 5,LH)
 835L Door - No. 5 Main Entry, LH


 D.
Prepare for the Removal


 S 014-003
 (1)  
Remove the entry door lining (Ref 52-11-02/401).

 S 014-055

 (2)  
Remove the sidewall panel above the door (AMM 25-59-01/401).

 S 864-006

 (3)
Open these circuit breakers and attach the DO-NOT-CLOSE tags:


 NOTE: Make sure the EMER LIGHTS switch is in the OFF position and
____ the circuit breakers for the emergency light are open (See the removal procedure of the door lining).
 (a)  P7 Overhead Circuit Breaker Panel
 1) 7A1 MAWEA PWR A
 2) 7B1 MAWEA PWR B

 S 034-007
 (4)  
Disconnect the entry door wire.

 (a)  
Disconnect the wires that go to the door from the terminal board installed above the door sill.

 (b)  
Remove the clamp block (3) from the wire bundle at the upper door sill. 1) Move the wire bundle through the grommet in the door sill.

 E.
Procedure

 (1)  
Close the door.

 (2)  
Install the lockpin on the mode selector lever.


 S 864-008
 S 494-009
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 1(64)