GUIDE
PLATE
HANDLE MECHANISM RELEASE LEVER
ANCHORPLATE BODY HINGE TORQUE TUBE
UPPER SLEEVE SEEC HOLD-OPEN FITTING
DOOR HINGE TORQUE TUBE ROTARY
SEE D SNUBBER
LOWER SLEEVE
DOOR LATCH TORQUE TUBE
LOWER
HINGE DOOR 5
LOWER LINKARM
MAIN ENTRY DOOR 5 BODY HINGE TORQUE TUBE
C
Main Entry Doors - Component Location Figure 102 (Sheet 4)
C73541
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-11-00
ALL ú ú 02 Page 105 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
FAULT ISOLATION/MAINT MANUAL
UPPER HINGE HOUSING
BEARING
UPPER HINGE ARM
GUIDE ARM
GUIDE ARM
FITTING
UPPER SHAFT
BEARING ASSEMBLY
UPPER AND LOWER COUPLING
CONTROL ROD
CRANK LOWER SHAFT
BEARING
LOWER HINGE HOUSING
LOWER HINGE ARM
MAIN ENTRY DOOR 5 DOOR HINGE TORQUE TUBE
D
Main Entry Doors - Component Location Figure 102 (Sheet 5)
C72233
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-11-00
ALL ú ú 02 Page 106 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
MAIN ENTRY DOOR - INSPECTION/CHECK
__________________________________
1. General_______
A. This procedure contains these tasks:
(1)
Examine the entry door for damage after it is hit with an object
(2)
Examine the condition of the hinge and torque tube mechanism for the entry door
(3)
Examine the condition of the mechanism that latches the door
(4)
Examine the internal handle of the main entry door.
B.
The First task makes sure the door operates after it is hit with an external object.
C.
The second task makes sure the hinge and torque tube mechanisms are in a good condition.
D.
The third task looks at the mechanism that latches the door and makes sure it is in a good condition.
E.
The task to examine the internal handle of the main entry door is included in the task to examine the main entry door for damage after it is hit. Thus, if you do the task to examine the main entry door for damage after it is hit, then it is not necessary to do the task to examine the internal handle.
TASK 52-11-00-706-001
2. Examine the Main Entry Door for the Correct Operation_____________________________________________________
A. Access
(1)
Access Panel
831L Door - No. 1 Main Entry, LH
835L Door - No. 5 Main Entry, LH
B.
Procedure
S 016-002
(1)
Open the door as follows:
(a)
Make sure the door is closed and latched.
(b)
Turn the door handle to the open position.
(c)
Use the assist handle to push the door through its opening.
(d)
Make sure the effect of the snubber on the operation of the door is correct.
(e)
Make sure the hold-open device holds the door in the open position.
(2)
Remove all persons and equipment from the door operation area.
S 216-003
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
52-11-00
ALL ú ú 01A Page 601 ú Jun 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
S 416-004
(3)
Close the door as follows:
(a)
Disengage the hold-open device.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 1(27)