• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:11来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

______________________________________________________
 A.  Access
 (1)  
Location Zone
 224 Fwd Upper Deck, RH


 (2)  
Access Panel
 847R Upper Deck Emergency Door, RH


 B.  
Procedure


 S 866-013
 (1)  
Move the door to the aft position.

 S 986-002

 (2)  
Release the manual latch handle.


 S 716-005
 CAUTION: DO NOT USE THE INTERIOR HANDLE TO MOVE THE DOOR FORWARD.
_______ THIS CAN CAUSE THE EXTERIOR HANDLES TO EXTEND WHICH WILL CAUSE DAMAGE TO THE AIRPLANE.
 (3)
Move the door forward to feel that it moves freely on the tracks.

 S 716-004

 (4)  
Do a check of the interior handle operation as follows:

 (a)  
With the door against the forward snubber, rotate the interior handle one-half turn counterclockwise.

 (b)  
Feel that the handle rotates freely.

 (c)  
See that the door lifts into the doorway.

 (d)  
See that the latch cams engage the latch fittings and lock the door in the closed position.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-13-00
 ALL  ú ú 02 Page 601 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 TASK 52-13-00-216-006
 3.  Visual Inspection of the Upper Deck Crew Service Door Operating Mechanism_________________________________________________________________________ (Lining Installed)__________________
 A.  General
 (1)
This is a scheduled maintenance task.

 B.  
Access

 (1)  
Location Zone
 224 Fwd Upper Deck, RH


 (2)  
Access Panel
 847R Upper Deck Emergency Door, RH


 C.  
Procedure


 S 216-007
 (1)
Do a visual inspection of the latch cams and latch rollers.

 (a)
Make sure there is no debris in the cams.

 (b)
Make sure the rollers move smoothly and are clean.


 S 216-008
 (2)
Do a visual inspection of the upper hinge.

 (a)
Make sure there is no damage to the hinge mechanism.

 (b)
Make sure there are no missing fasteners.


 S 216-009
 (3)
Do a visual inspection of the lower hinge.

 (a)
Make sure the lower hinge mechanism is clean.

 (b)
Make sure there is no damage to the lower hinge mechanism.

 (c)
Make sure there are no missing fasteners.


 TASK 52-13-00-216-012
 4.  Visual Inspection of the Upper Deck Crew Service Door Operating Mechanism_________________________________________________________________________ (Lining Removed)________________
 A.  General
 (1)
This is a scheduled maintenance task.

 B.  
Access

 (1)  
Location Zone
 224 Fwd Upper Deck, RH

 

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-13-00
 ALL  ú ú 02 Page 602 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 (2)  
Access Panel
 847R Upper Deck Emergency Door, RH


 C.
Procedure


 S 016-011
 (1)  
Remove the lining from the door.

 S 216-012

 (2)  
Do a visual inspection of the door mechanisms.

 (a)  
Look at the handle mechanism. 1) Make sure there are no loose fasteners. 2) Make sure the mechanism is clean. 3) Make sure there is no damage to the mechanism.

 (b)  
Look at the push rods. 1) Make sure there are no loose or missing fasteners. 2) Make sure there is no corrosion or damage.

 (c)  
Look at the torque tubes. 1) Make sure there are no loose or missing fasteners. 2) Make sure there is no corrosion or damage.

 (d)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 1(125)