14. MECHANISM HOUSING
15. SETSCREW
16. DOOR
HANDLE
13. EXTERNAL DOOR HOUSING
HANDLE ASSEMBLY
12. SHAFT ASSEMBLY
DOOR HANDLE ASSEMBLY
(CONFIGURATION 1)
B
Internal and External Door Handles
Figure 401 (Sheet 2)
H72588
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ONLY ú
52-13-03
ú ú 01 Page 402 ú Oct 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
4. PIN
3. CAPSCREW 3. CAPSCREW
5. INTERNAL
6. SCREW DOOR
HANDLE
11. SPACER
PLATE
9. CAM
ASSEMBLY
7. ADAPTER
8. SHIM
10. NUT
18. MECHANISM HOUSING
17. RECESSED FAIRING HOUSING
20. WASHER 21. SPACER
12. SHAFT ASSEMBLY
16. ADAPTER
19. SCREW
ASSEMBLY
21. SPACER
20. WASHER
14.
EXTERNAL DOOR HANDLE
15.
FAIRING
13. SCREW PLATE
19. SCREW
DOOR HANDLE ASSEMBLY (CONFIGURATION 2)
C
Internal and External Door Handles Figure 401 (Sheet 3)
H72592
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ONLY ú
52-13-03
ú ú 01 Page 403 ú Oct 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
INTERNAL AND EXTERNAL DOOR HANDLES - REMOVAL/INSTALLATION
_________________________________________________________
1. General
_______
A. This procedure is applicable to freighter airplanes only and has these tasks:
(1)
The removal of the internal/external door handles.
(2)
The installation of the internal/external door handles.
TASK 52-13-03-024-001
2. Removal of the Internal/External Door Handles
_____________________________________________
A. Special Tools and Equipment
(1)
Crew Service Door Safety Barrier - 6PRE65B00040
B.
Standard Tools and Equipment
(1)
Maintenance Stand (necessary to reach the crew service door).
C.
Access
(1)
Location Zone
223 Fwd Upper Deck LH
224 Fwd Upper Deck RH
D.
Procedure
S 024-046
(1)
Remove the butterfly external door handle assembly (configuration 1): (Fig. 401)
(a)
Remove the screws (1) and cover panels (2) from the crew service door.
(b)
Turn the internal door handle (9) to the open position.
(c)
Make sure that the external door handle (13) is returned to the stowed position .
(d)
Move the crew service door aft.
(e)
Install the safety barrier 6PRE65b00040 in the doorway.
(f)
Remove two cotter pins (3 and 6), washers (4 and 7), and pins (5 and 8 ) from the internal door handle (9).
(g)
Remove the internal door handle (9) from the cam assembly (10).
(h)
Remove the nut (11) from the end of the shaft assembly (12).
(i)
Move the crew service door forward until it is almost closed.
(j)
Remove the external door handle assembly (13) from the mechanism housing (14) bearings.
NOTE: If necessary, use a steel punch to remove the shaft
____ assembly (12) from the cam assembly (10).
S 024-047
(2)
Remove the T-shaped external door handle assembly (configuration 2): (Fig. 401)
(a)
Remove the screws (1) and cover panels (2) from the crew service door.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ONLY ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 1(132)