• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 10:11来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (c)  
Let the sealant cure for a minimum of 24 hours at 75°F and 50% relative humidity.


 S 414-018
 (8)  Install the door lining (Ref 52-11-02/401).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-09-01
 ALL  ú ú 03 Page 405 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 FLAP-TYPE MECHANICAL SEALS - MAINTENANCE PRACTICES
__________________________________________________
 1.  General
_______
 A.  This procedure contains two tasks. The first task is the removal of the flap-type mechanical seal. The second task is the installation of the flap-type mechanical seal.
 B.  The flap-type mechanical seals are installed on all of the main entry doors, the upper deck emergency doors, crew entry doors, all cargo doors and the nose cargo door. The full seal removal and installation is done by this procedure.
 NOTE: This repair also applies to the seals around the presure relief
____ doors which are parts of the lower cargo doors and the side cargo door.
 TASK 52-09-02-002-001
 2.  Remove the Flap-Type Mechanical Seal (Fig. 201)
____________________________________
 A.  References
 (1)  
IPC 52-09-06 Fig. 1

 B.  
Access

 (1)  
Location Zones
 549 Crew Entry Service Door
 801 Nose Cargo Door
 821 Forward Cargo Door
 822 Aft Cargo Door
 823 Bulk Cargo Door
 831 No. 1 Main Entry Door, Left
 835 No. 5 Main Entry Door, Left
 836 Side Cargo Door


 C.  
Procedure


 S 822-002
 (1)
Put the door in a position to make the removal of the seal easy.

 S 032-003

 (2)  
Hold the lip of the seal and pull and roll the seal to disengage it from the seal retainer.

 S 022-004

 (3)  
Continue to pull the seal from the seal retainer along the edges of the door until the seal is removed.


 TASK 52-09-02-402-005
 3.  Install the Flap-Type Mechanical Seal (Fig. 201)
_____________________________________
 A.  Special Tools and Equipment
 (1)  
B52004-1 - Door Seal Installation Tool

 B.  
Consumable Materials

 (1)  
B00048 Detergent - Spraywhite E


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-09-02
 ALL  ú ú 03 Page 201 ú Jun 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL


Flap-Type Mechanical Seal
Figure 201

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 52-09-02
 ALL  ú ú 01 Page 202 ú Jun 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 (2)  
G00294 Tape - Masking, Permacel No. 76

 C.
References

 (1)  
IPC 52-09-06 Fig. 1

 D.
Access

 (1)  
Location Zones
 549 Crew Entry Service Door
 801 Nose Cargo Door
 821 Forward Cargo Door
 822 Aft Cargo Door
 823 Bulk Cargo Door
 831 No. 1 Main Entry Door, Left
 835 No. 5 Main Entry Door, Left
 836 Side Cargo Door


 E.
Procedure


 S 422-026
 CAUTION: MAKE SURE THE LARGE FILLET RADIUS OF THE SEAL FACES INBOARD.
_______ IF THE LARGE RADIUS DOES NOT FACE INBOARD, THE SEAL WILL NOT HOLD PRESSURE AND THE AIRPLANE WILL NOT PRESSURIZE.
 (1)
Put the seal into the correct position around the edge of the door.

 (a)  
Make sure the short leg on the bottom is in the direction of the edge of the door.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 舱门 DOORS 1(12)