 (6)  Remove and discard the damaged double-back tape and/or the velcro tape, if it is necessary.
 TASK 25-16-00-404-005
 3. Install the Floor Coverings
___________________________
 A. Consumable Materials
 (1)  
G00347 Tape - Double-back, Permacel P-55

 (2)  
G00000 Tape - Double-back, Orcon OT-30 (preferred)


 B. References
 (1)  
25-11-01/401, Pilots' Seats

 (2)  
25-11-03/401, Observers' Seats


 C. Access
 (1)  Location Zones
 221 Control Cabin, Left
 222 Control Cabin, Right

 D. Procedure
 S 434-006
 (1)  
Install the new double-back tape and/or the velcro tape to the floor, if it is necessary.

 S 424-007

 (2)  
Install the floor covering sections on the floor.


 NOTE: Make sure the double-back tape and/or the velcro tape
____ holds the floor covering sections to the floor.
 S 434-008
 (3)  Install the threshold at the flight compartment door.
 NOTE: Make sure you tighten the threshold screws sufficiently to
____ keep the edges of the floor covering sections in position.
 S 414-007
 (4)
Install the pilots' seats, if it is necessary (AMM 25-11-01/401).

 (5)  
Install the observers' seats, if it is necessary (AMM 25-11-03/401).


 S 414-008
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-16-00
 ALL  ú ú 03 Page 402 ú Feb 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 PASSENGER COMPARTMENTS - DESCRIPTION AND OPERATION
__________________________________________________
 1.  General (Fig. 1)
_______
 A.  The passenger compartment is the area on the upper deck between the flight deck and the crew rest.
 B.  The galley, lavatory, and coat closet modules, the major items of equipment and furnishings installed in the upper deck compartment, are used for reference location of items such as partitions, stowage boxes, curtains, and loose emergency equipment.
 C.  Equipment/furnishings as installed within the upper deck compartment in the delivery configuration, and as supplied as flyaway equipment on follow-on delivery kits, are covered in subsections under this number block as follows:
 (1)  
Sidewall and ceiling lining and insulation (AMM 25-21-00/001).

 (2)  
Closets and partitions (AMM 25-24-00/001).

 (3)  
Seats (AMM 25-25-00/001) in the upper deck provided for ride-along passengers.

 (4)  
The stowable ladder provides the means of access between the main deck cargo compartment and the upper deck compartment and flight compartment.

 (5)  
Floor coverings (AMM 25-27-00/001) including carpets, pads and mats used in the upper deck passenger compartment. Refer to 25-27-00/001 for floor covering inside the lavatory modules.


 D.  Other items of equipment/furnishings installed within passenger compartments, not covered in subsections under this section number block, are covered by unit or equipment titled in section blocks as follows:
 (1)  
Buffet/Galley, 25-30-00/001

 (2)  
Lavatories and Vanities, 25-40-00/001

 (3)  
Cargo and Accessory Compartments, 25-50-00/001

 (4)  
Emergency Equipment, 25-60-00/001


 E.  Pressure relief panels are provided in certain floor and dado panels to allow pressure equalization without structural damage in case of explosive decompression.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-20-00
 ALL  ú ú 19 Page 1 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

CLOSET
GALLEY
STOWABLE LADDER
CLOSET
LAVATORY
DOUBLE SEAT (2 LOCATIONS)
DOUBLE BUNK (2 LOCATIONS)
Upper Deck Major Equipment and Furnishings Location
Figure 1

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 