(2)  
Adhesive, BMS 5-7 Type I or Type II
 NOTE: You can use one of these adhesives:
____
 (a)  
A00165 EC1300-L (Type I)
 (b)  
A00929 EC2155 (Type II)
 (3)  
G00033 Cheesecloth, BMS 15-15
 (4)  
Pads - Steel wool
 (5)  
Retainers - Zipper, B.F. Goodrich
 (a)  
G00103 End Seal Cap BC-9A
 (b)  
G00104 End Stop BS-9
 (6)  
Slider - Zipper, B.F. Goodrich
 NOTE: You can use one of these zipper sliders:
____
 (a)  
G00161 SL-9X
 (b)  
G00162 SL-9Y
 (c)  
G00163 SL-9Z
 (7)  Solvent
 NOTE: You can use one of these solvents:
____
 (a)  
B00111 Freon TF
 (b)  
B00093 Tetrachloroethylene 0-T-236
 (c)  
B00090 1.1.1 Trichloroethane MIL-T-81533A
 (8)  G00843 Wipers - Clean, Lint-Free, Cotton
 C. Access
 (1)  Location Zone
 100 Lower Half of Fuselage
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 25-52-01
 ALL  ú ú 01A Page 815 ú Jun 10/94 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 
MAINTENANCE MANUAL
 D. References
 (1)  
AMM 25-52-01/401, Containerized Cargo Compartment Ceiling and Sidewall Linings
 (2)  
AMM 25-55-02/401, Bulk Cargo Compartment Ceiling and Sidewall Linings
 E. Procedure
 S 028-045
 (1)  
Remove the cargo lining from the support structure if it is
 necessary (AMM 25-52-01/401 or AMM 25-55-02/401).
 S 358-046
 (2)  
Remove the seal cap retainer from the end of the zipper chain and discard it.
 NOTE:____The seal cap retainer is bonded to the zipper chain. A solvent can be used to loosen the bond.
 S 358-047
 (3)  Remove the end stop retainer from the end of the zipper chain and discard it.
 NOTE: A pair of pliers can be used to remove the end stop retainer.
____
 S 358-048
 (4)  Move the zipper slider to the end of the zipper chain.
 NOTE: The zipper chain will be open.
____
 S 358-049
 (5) 
Remove the zipper slider from the zipper chain and discard it.
S 358-050
 (6)  
Install the new zipper slider on the end of the zipper chain.
 NOTE: The zipper slider must engage the teeth of the zipper chain
____
 correctly.
 S 358-051
 (7)  Move the zipper slider away from the end of the zipper chain.
 NOTE: The zipper chain will be closed.
____
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 25-52-01
 ALL  ú ú 02A Page 816 ú Oct 18/99 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 S 358-052
 (8)  Install a new end stop retainer on the end of the zipper chain.
 NOTE: The end stop retainer must be fully attached to the zipper
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 1(125)