G00000 Tape - Velcro, BMS 8-285, Type I, 1.0-inch wide
(7)
G00009 Compound - Corrosion Preventive BMS 3-23
B. References
(1)
AMM 25-52-01/401, Containerized Cargo Compartment Ceiling and Sidewall Linings
(2)
AMM 51-24-13/701, Water Displacing Corrosion Preventive Compound
C. Access
(1) Location Zones 121 Forward Cargo Container Compartment Fwd Half, Left 122 Forward Cargo Container Compartment Fwd Half, Right 123 Forward Cargo Container Compartment Aft Half, Left 124 Forward Cargo Container Compartment Aft Half, Right 141 Aft Cargo Container Compartment, Left 142 Aft Cargo Container Compartment, Right
D. Procedure
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-52-04
ALL ú ú 05 Page 409 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 014-034
CAUTION: LET THE SOLVENTS FROM THE CORROSION-INHIBITING COMPOUND (CIC)
_______ FULLY EVAPORATE. IF CIC GETS ON THE INSULATION BLANKETS BEFORE THE SOLVENTS EVAPORATE, THE INSULATION BLANKET WILL BECOME LESS FLAME-RESISTANT. APPLY CIC (BMS 3-23, BMS 3-26, BMS 3-29, OR EQUIVALENT) ONLY TO METALLIC AIRPLANE COMPONENTS.
(1) If Corrosion-Inhibiting-Compound (CIC) contamination of insulation blankets occurs, adhere to the following steps:
(a)
Replace the insulation blanket if CIC contamination occurs along the seam.
(b)
For all areas except along seams, remove the CIC with Biogenic SE377C, Aliphatic Naptha, Citra-Safe, or equivalent.
NOTE: If the CIC cannot be removed, replace the blanket.
____
(c) In order to prevent corrosion-inhibiting compound (CIC) contamination of insulation blankets, obey the following steps prior to blanket installation:
NOTE: Adjust the ventilation times of the following steps
____ upward to achieve satisfactory drying. Drying depends on the temperature, humidity, and quantity of CIC.
1) Ventilate areas, after application of CIC such as BMS 3-23, for a minimum of 1 hour. 2) Ventilate area, after application of CIC such as BMS 3-26 or BMS 3-29, for a minimum of 4 hours.
S 624-009
(2)
Apply the corrosion preventative compound, BMS 3-23, to the structure, as necessary (AMM 51-24-13/701).
S 434-010
(3)
Repair or install the dacron cord for the insulation blankets to be installed at the bottom of the lower lobe, if necessary.
S 114-019
WARNING: DO NOT GET SOLVENTS IN YOUR MOUTH, OR YOUR EYES, OR ON YOUR
_______ SKIN. DO NOT BREATHE THE FUMES FROM SOLVENTS. SOLVENTS ARE HAZARDOUS MATERIALS. SOLVENTS MAY BE FLAMMABLE OR HARMFUL TO THE ENVIRONMENT. REFER TO PRODUCT MATERIAL SAFETY DATA SHEETS (MSDS) AND LOCAL REQUIREMENTS FOR PROPER HANDLING PROCEDURES.
(4) Use methyl ethyl ketone or Acetone to clean the structure before you install velcro tape or double-back tape to the structure.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
25-52-04
ALL ú ú 03 Page 410 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
S 434-012
(5) Install velcro tape and/or double-back tape as necessary.
S 434-020
(6) Install new nut/stud fasteners to the structure as necessary.
S 424-013
(7) Put the insulation blanket in place and press down on the blanket to
attach it to the nut/stud fasteners and/or the tape.
NOTE:____ Make sure the blanket is installed with the part number
adjacent to the structure. Make sure that wire bundles are
not placed between the insulation blankets and aircraft
structure and are secured to reduce the possibility of wire
chafe.
S 434-016 CAUTION: CUT OFF THE SHARP ENDS OF THE NUT/STUD FASTENERS IN THE AREAS
_______ WHERE THE FASTENERS MAY CAUSE INJURY TO PERSONS.
(8)
Install the clips on the nut/stud fasteners to hold the blankets in place, as necessary.