 PANELS, CONTROL - CARGO HANDLING 25-53-17 Removal/Installation 401 ALL Approved Repairs 801 ALL
 ROLLER - BRAKING 25-53-23 Removal/Installation 401 ALL ROLLER - DOORSILL 25-53-16 Removal/Installation 401 ALL ROLLER - TRANSPORT 25-53-24 Removal/Installation 401 ALL UNIT - BALL 25-53-18 Removal/Installation 401 ALL UNIT, DRIVE - POWER 25-53-01 Removal/Installation 401 ALL
 25-CONTENTS
 GUN Page 9 Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 CHAPTER 25 - EQUIPMENT/FURNISHINGS TABLE OF CONTENTS
_________________ Chapter
 Section
 Subject_______  Subject_______  Page____ 
CONTAINERIZED CARGO RESTRAINING  25-54-00
 SYSTEM
 Description and Operation  1 
General  1
 Guides - Side  2
 Guides, Center - Automatically  2
 Retractable
 Guides, Center - Manually  1
 Retractable
 Locks - Pallet  3
 Rails - Splitter  2
 Restraints Doorsill - 1
 Semi-Automatic
 Stops - Container  3
 Stops - End  2
 Operation  3
 Inspection/Check  601 
GUIDES - CONTINUOUS SIDE  25-54-03
 Removal/Installation  401 
RESTRAINTS, CARGO - RETRACTABLE  25-54-01
 Servicing  301 
RESTRAINTS, DOORSILL - 25-54-02
 SEMIAUTOMATIC
 Maintenance Practices  201 
BULK CARGO COMPARTMENT  25-55-00
 Description and Operation  1 
General  1
 Blankets - Insulation  1
 Linings - Ceiling and Sidewall  1
 Nets and Tiedowns - Cargo  1
 Restraint
 INSULATION - BULK COMPARTMENT  25-55-03
 Removal/Installation  401 
Bulk cargo compartment  406
 insulation - installation
 Bulk cargo compartment  401
 insulation - removal

Effectivity
ALL
ALLALLALL
ALLALL
ALL
 25-CONTENTS
 GUN Page 10 Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 CHAPTER 25 - EQUIPMENT/FURNISHINGS
 TABLE OF CONTENTS
_________________
 Chapter Section Subject_______ Subject ____ Effectivity
_______ Page ___________
 LININGS, CEILING AND SIDEWALL -25-55-02
 BULK CARGO COMPARTMENT

 Removal/Installation 401 ALL Ceiling lining - removal 401 Ceiling linings -404
 installation
 Sidewall lining 411
 -installation
 Sidewall linings - removal 406
 NETS, CARGO - BULK CARGO 25-55-01
 COMPARTMENT
 Removal/Installation 401 ALL
 Bulk cargo compartment cargo 401
 nets
 Inspection/Check 601 ALL
 MAIN DECK CARGO HANDLING SYSTEM 25-57-00

 Description and Operation 1 ALL General 1 Assemblies, Sill Roller 12 Drive Units - Power 12 Panels - Caster 12 Panels - Control 13 Trays - Caster 12 Trays - Roller 12 Trays, Lock/Stop Roller-Caster 12 Operation 16
 Component Location 101 ALL Component Index Component Location
 Servicing 301 ALL
 25-CONTENTS
 GUN Page 11 Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 CHAPTER 25 - EQUIPMENT/FURNISHINGS
 TABLE OF CONTENTS_________________
 Chapter
 Section
 Subject Subject_______ _______  Page____  Effectivity___________
 Adjustment/Test  501  ALL
 General  501
 Adjustment-Main Deck Cargo  527
 Drive System
 Operational Test-Main Deck  501
 Cargo Drive System
 System Test-Main Deck Cargo  534
 Drive
 ACTUATOR, STEERING - PDU 25-57-02
 Removal/Installation  401  ALL
 ASSEMBLY, PANEL - CASTER 25-57-05
 Removal/Installation  401  ALL
 ASSEMBLY, SILL ROLLER/CASTER AND 25-57-03
 GUIDE- RETRACTABLE SIDE DOOR
 Removal/Installation  401  ALL
 DRIVE-WHEEL ASSEMBLY AND 25-57-11
 DRIVE-WHEEL ACTUATOR, PDU
 Removal/Installation  401  ALL
 LIMIT SWITCH, STEERING - PDU 25-57-15
 Removal/Installation  401  ALL
 PANEL - ELECTRICAL/ELECTRONIC 25-57-06
 BAY ACCESS
 