 32-42-00
 ALL  ú ú 01 Page 112 ú Oct 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL

BRAKE TORQUE SENSOR INSTALLATION (TYPICAL)


Brake Control System - Component Location
Figure 102 (Sheet 10)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-42-00
 ALL  ú ú 01 Page 113 ú Feb 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 FAULT ISOLATION/MAINT MANUAL
WHEEL SPEED 
TRANSDUCER 
(EXAMPLE) 
SEE  N 
WHEEL 
(REF) 
WHEEL SPEED 
TRANSDUCER 
(M46 THROUGH M61) 
TRANSDUCER 
DOG (REF) 
CUP 
(REF) 
COUPLING 

HUBCAP (REF)
WHEEL SPEED TRANSDUCER (EXAMPLE)N
Brake System Control - Component Location
Figure 102 (Sheet 11)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-42-00
 ALL  ú ú 02 Page 114 ú Apr 10/89
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 BRAKE CONTROL SYSTEM - ADJUSTMENT/TEST
______________________________________
 1.  General_______
 A.  This procedure contains these tasks:
 (1)  
Operational Test - Brake Control System

 (2)  
Ground Test - Brake System Bite

 (3)  
Ground Test - Brake Release

 (4)  
Ground Test - Autobrake Application

 (5)  
Ground Test - Torque Zero Function

 (6)  
System Test - Brake Control System

 B.  
The operational test task does a test of the Line Replaceable Units (LRU's) of the brake control system. The four ground tests for the brake control system are used to complete the operational test of the brake control system.

 C.  
The system test task is a more complete test of the brake control system. The four ground tests are completed as part of the system test task. The system test task is also used to do a test of:

 (1)  
The interfaces of the brake control system with other systems of the airplane

 (2)  
System indication

 (3)  
The analog inputs of system components

 (4)  
The analog inputs of airplane components that supply inputs to the brake control system as well as to other airplane systems.

 D.  
For general information on the operation of the Central Maintenance Computer System, (AMM 45-10-00/201).


 TASK 32-42-00-715-001
 2.  Operational Test - Brake Control System_______________________________________
 A.  Access
 (1)  Location Zones
 221 Control Cabin, LH
 222 Control Cabin, RH
 730 Wing Landing Gear - Left and Doors
 740 Wing Landing Gear - Right and Doors
 750 Body Landing Gear - Left and Doors
 760 Body Landing Gear - Right and Doors

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-42-00
 ALL  ú ú 01 Page 501 ú Oct 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 B. Preconditions
 S 865-408
 (1)  
This condition is necessary for this task:

 (a)
Electrical Power is available (AMM 24-22-00/201).

 C.
Do the Operational Test of the Brake Control System


 S 715-293
 (1)  
Do this task "Ground Test - Brake System Bite"

 S 715-294

 (2)  
Do this task "Ground Test - Brake Release"

 S 715-295

 (3)  
Do this task "Ground Test - Autobrake Application"

 S 715-296
 