(2)  
This installation of the parking brake linkage.
 B.  
The parking brake linkage is installed below the pilot's control stand. You must remove ceiling panels from the passenger deck to get access.
 C.  
This procedure gives the steps to remove the torque tube assembly with the attached pawls and levers. You must remove the levers and bearings to remove the counter shaft.
 D.  
After you install the linkage, you will adjust it and do a test on it.
 TASK 32-44-02-024-003
 2.  Removal of the Parking Brake Linkage (Fig. 401)____________________________________
 A.  References
 (1)  
AMM 25-22-01/401, Passenger Compartment Ceiling Lining
 (2)  
IPC 32-44-60 Fig. 1
 B.  
Access
 (1)  
Location Zone 211 Passenger Cabin - Nose to First Door, L.H. 221 Control Cabin, L.H.
 C.  
Procedure
 S 494-001
 (1)  
Install chocks at all wheels.
 (2)  
Release the parking brake.
S 014-002
 (3)  
Remove the fourth middle and left ceiling panels in the passenger compartment forward of door No. 1 (AMM 25-22-01/401).
S 024-005
 (4)  
Remove the torque tube assembly (8).
 (a)  
Remove the spring (12) from the structure and the pawl.
 S 864-004
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-44-02
 ALL  ú ú 01 Page 401 ú Oct 10/97 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 747-400 MAINTENANCE MANUAL  
STAND PILOTS' CONTROL  
UPPER FLOOR DECK  LEVER PARKING BRAKE  COUNTER SHAFT ASSEMBLY  
SEE  A  DOOR ENTRY NO. 1  SEE  B 
BRAKE/RUDDER PEDAL 
TORQUE TUBE ASSEMBLY 
SEE C 
BRAKE PEDAL 
BELLCRANK 
ASSEMBLY
A 
Parking Brake Linkage Installation Figure 401 (Sheet 1)
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-44-02
 ALL  ú ú 01 Page 402 ú Feb 10/91 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 
MAINTENANCE MANUAL
16. SCREW 17. ROD 
ASSEMBLY
15.  SCREW 
18. WASHER 
14.  INBOARD 
19. NUT 
LEVER 
20. INBOARD BEARING HOUSING 
25.  SCREW 
21.  COUNTER SHAFT 
24.  OUTBOARD BEARING HOUSING 
32.  WASHER 
31.  NUT 
31.  NUT 
30.  WASHER 
32.  LOCKBOLTSTRUCTURE 
23.  WASHER 
27.  WASHER 
(2 LOCATIONS) 
22.  
NUT 28. OUTBOARD (4 LOCATIONS) LEVER
23.  
WASHER (2 LOCATIONS) 25. SCREW 29. SCREW
26.  NUT 
6.  PUSHROD 
3. SCREW  COUNTER SHAFT ASSEMBLY 
(3 LOCATIONS) 4. NUT 
B 
5. WASHER 
LEVER 
6. PUSHROD 
2. NUT 
7. SCREW 
1. BEARING 8. TORQUE TUBEASSEMBLY ASSEMBLY 
9. 
NUT (3 LOCATIONS)
10.  
WASHER (3 LOCATIONS)
11.  
BEARING ASSEMBLY
12.  
SPRING
3. SCREW9. NUT (3 LOCATIONS)(3 LOCATIONS) 
10.  WASHER 
(3 LOCATIONS)
2. NUT 
STRUCTURE 
TORQUE TUBE ASSEMBLY C 
Parking Brake Linkage Installation 
Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 32-44-02
 ALL  ú ú 01 Page 403 ú Feb 10/91 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A 
747-400 MAINTENANCE MANUAL
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 7(118)