32-50-00
ALL ú ú 01 Page 1 ú Jun 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
STEERING - MAINTENANCE PRACTICES
________________________________
1. General_______
A. This procedure gives steps to install and remove the rig pins in the steering system.
B. Use this procedure when it is necessary to install any of the rig pins in the steering system.
TASK 32-50-00-862-001
2. Installation of the Rig Pins in the Steering System (Fig. 201).______________________________________________________________
A. Special Tools and Equipment
___________________________
(1) G12001 Rigging Pins - NS-1, NS-2, NS-3, NS-4, NS-5, and NS-6
NOTE: Rigging pins are part of G12001 kit.
____
~............................................................. | Rigging Pin No. | Length (inches) | Diameter (inches) | ............................................................... | NS-1 | 4.00 | 0.311 (+0.000/-0.002)| ............................................................... | NS-2 | 4.00 | 0.311 (+0.000/-0.002)| ............................................................... | NS-3 | 6.00 | 0.311 (+0.000/-0.002)| ............................................................... | NS-4 | 2.50 | 0.311 (+0.000/-0.002)| ............................................................... | NS-5 | 4.00 | 0.311 (+0.000/-0.002)| ............................................................... | NS-6 | 2.50 | 0.188 (+0.000/-0.002)| 2..................…...................…......................1
B. References
(1)
AMM 09-11-00/201, Towing
(2)
AMM 25-22-01/401, Main Passenger Cabin Ceiling Panels
(3)
AMM 32-00-30/201, Landing Gear Door Locks
C.
Access
(1)
Location Zones 117 Electrical and Electronics Compartment, LH (Rigging pin NS-4) 211 Passenger Cabin - Nose to First Door
(Rigging pin NS-3, R03) 221 Control cabin, LH (Rigging pin NS-1) 222 Control Cabin, RH (Rigging pin NS-2) 715 Nose Landing Gear (Rigging pin NS-5, NS-6)
D. Prepare to Install the Rig Pins
S 862-002
(1) Make sure you install the ground locks in the nose and the main landing gear (AMM 09-11-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-50-00
ALL ú ú 02 Page 201 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
Steering System Rigging Pin Installation
Figure 201 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-50-00
ALL ú ú 01 Page 202 ú Feb 10/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
STEERING TILLER HANDLE (CAPTAIN'S)
NWS1A
RIG PIN NS-1
(CAPTAIN'S)
RIG PIN NS-2
(FIRST OFFICER'S) A
FWD STEERING ROD
QUADRANT
STEERING
CRANK
CLUTCH ARM
INTERCONNECT
LEVER
RIGGING
PIN NS-3
B
Steering System Rigging Pin Installation
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 7(171)