• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 15:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 TASK 29-09-00-862-025
 2.  Pressurize The Hydraulic Reservoirs
___________________________________
 A.  Special Tools and Equipment
 (1) Lock for the Reservoir Depressurization Valve - B29002-5
 B.  Standard Tools and Equipment
 (1) Controlled source of clean, dry air, 46 psi
 C.  Access
 (1)  Location Zone
 216, 217 Main Wheel Well

 D.  Procedure
 S 862-002
 (1) Make sure the reservoir depressurization (vent) valve for each system reservoir is in the closed (non-vented) position.
 NOTE: The two hydraulic reservoirs are pressurized at the same
____ time when the two depressurization valves are closed.
 S 492-023
 CAUTION:_______DO NOT USE MORE THAN 70 PSI PRESSURE. IF YOU USE TOO MUCH PRESSURE, DAMAGE TO THE EQUIPMENT CAN OCCUR.
 (2) Connect the air source to the valve for manual air pressurization.
 NOTE: The valve is on the reservoir pressurization module.
____
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-09-00
 ALL  ú ú 01A Page 201 ú Mar 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
DEPRESSURIZATION
DEPRESSURIZATION VALVE FOR THE
VALVE FOR THE SYSTEM B RESERVOIR
SYSTEM A RESERVOIR RESERVOIR
SEE B VALVE
SEE BPRESSURIZATION SUPPORT
MODULE
TUBING ASSEMBLY SEE A
(2 LOCATIONS)  TO THE SYSTEM B RESERVOIR
SEE D TO THE SYSTEM A RESERVOIR
FORWARD WHEELWELL BULKHEAD
CHECK VALVE
VALVE FOR PNEUMATIC (2 LOCATIONS)
MANUAL AIR SUPPLY LINE
PRESSURIZATION
RESERVOIR
SEE C

PRESSURIZATION MODULE
INBD FWD
RESERVOIR PRESSURIZATION MODULE
A
PUSH TO RELEASE THE PRESSURE
DEPRESSURIZATION (VENT) VALVE
(2 LOCATIONS)

B

Reservoir Pressurization Module
Figure 201 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-09-00
 ALL  ú ú 01A Page 202 ú Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

737-300/400/500
MAINTENANCE MANUAL

VALVE
CAP
VALVE FOR MANUAL AIR PRESSURIZATION C
FORWARD WHEELWELL
CHECK
BULKHEAD
VALVE
1
VALVE ASSEMBLY
TUBING ASSEMBLY
(2 LOCATIONS)

SWIVEL ELBOW
TEE VALVE
TEE RESERVOIR PRESSURIZATION FWD MODULE
VENT CAP
INBD
TUBING ASSEMBLY
1 THE CHECK VALVE IS INSTALLED IN THE TEE VALVE ASSEMBLY
D
Reservoir Pressurization Module Figure 201 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-09-00
 ALL  ú ú 03A Page 203 ú Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 862-009
 (3)
Turn the nut on the valve body to pressurize the reservoir.

 S 862-010

 (4)  
Adjust the pressure of the air supply to pressurize the reservoir to 46 |1 psi.

 S 862-011

 (5)  
Close the valve for manual air pressurization.

 S 212-021

 (6)  
Make sure the pressure in the reservoir stays stable.


 NOTE: The air pressure lines between the pressurization module
____ and the reservoirs contain vent orifices. These orifices bleed the air pressure out of the lines after the air source is removed. The check valves in the depressurization valves hold air pressure in each reservoir.
 S 092-024
 (7)  Disconnect the air source from the valve for manual air pressurization.
 TASK 29-09-00-862-013
 3. Release The Pressure From The Hydraulic Reservoirs
__________________________________________________
 A. Special Tools and Equipment
 (1)  Lock for the Reservoir Depressurization Valve - B29002-5
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 液压 HYDRAULIC POWER(46)