• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 15:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (i)  
Remove the standby reservoir.


 TASK 29-15-51-404-001
 3.  Standby Hydraulic System Reservoir Installation (Fig. 401)_______________________________________________
 A. Special Tools and Equipment
 (1)  B29002-5 - Reservoir Depressurization Valve Lock
 B. Consumable Materials
 (1)  
D00567 Skydrol Assembly Lube - MCS 352

 (2)  
D00568 Fluid - Hydraulic, BMS 3-11


 C. References
 (1)  12-12-00/301, Hydraulic Reservoir
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-15-51
 ALL  ú ú 02 Page 404 ú Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (2)  29-09-00/201, Hydraulic Reservoir Pressurization System
 D. Access
 (1)  Location Zone
 101 Control Cabin, LH
 102 Control Cabin, RH
 215 Keel Beam

 E. Procedure
 S 214-035
 CAUTION: MAKE SURE THE RESERVOIR MOUNTING SURFACES ARE CLEAN AND
_______ UNWANTED MATERIAL DOES NOT GO INTO THE RESERVOIR OR THE HYDRAULIC LINES. THIS CAN CAUSE DAMAGE TO EQUIPMENT.
 (1)  
Make sure there are no unwanted materials on the reservoir surfaces and in the reservoir or the hydraulic lines.

 S 424-041

 (2)  
Install the standby reservoir:

 (a)  
Apply assembly lube or hydraulic fluid to the O-rings.

 (b)  
Apply assembly lube or hydraulic fluid to the threads of the check valve and all unions, reducers and couplings.

 (c)  
Install the O-rings, quick-disconnect, check valve, unions and reducers in the reservoir ports if they are not installed.

 (d)  
Put the reservoir in its mounting position.

 (e)  
Install the reservoir to the mounting assembly with the fasteners.

 (f)  
Install the low quantity switch.

 (g)  
Connect the electrical connector.

 


 S 864-023
 (3)  Make sure this circuit breaker is closed:
 (a)  P6-2 Circuit Breaker Panel
 1) OIL QTY IND SYS B

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-15-51
 ALL  ú ú 01 Page 405 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 214-024
 (4)  Make sure the STANDBY HYD LOW QUANTITY (P5), FLT CONT (P2) and left and right MASTER CAUTION (P2) lights are on.
 S 434-025
 CAUTION: MAKE SURE THE DISCONNECT POPPET IS STRAIGHT BEFORE YOU INSTALL
_______ THE HOSE HALF OF THE SELF-SEAL DISCONNECT. IF TOO MUCH TORQUE IS NECESSARY TO DO THE INSTALLATION, DISCONNECT THE SELF-SEAL DISCONNECT AND AGAIN MAKE SURE THE POPPET IS STRAIGHT. AFTER THE INSTALLATION, MAKE SURE THE INDICATOR PINS EXTEND A MINIMUM OF 0.06 INCH. IF THE INDICATOR PINS ARE NOT CORRECTLY EXTENDED, FLUID FLOW WILL BE DECREASED OR STOPPED. THIS CAN CAUSE DAMAGE TO THE RESERVOIR OR THE PUMP.
 (5)  
Connect the pump supply line between the reservoir and the standby pump.

 S 434-026

 (6)  
Connect all other hydraulic lines to the standby reservoir.

 S 614-027

 (7)  
Do the servicing for the standby and system B hydraulic reservoirs (Ref 12-12-00/301).

 (8)  
Remove the reservoir depressurization valve lock.

 (9)  
Close the system B hydraulic reservoir depressurization valve.

 S 864-029

 (10)
 Pressurize the standby and system B hydraulic reservoirs (Ref 29-09-00/201).


 S 094-042
 S 434-028
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-15-51
 ALL  ú ú 01 Page 406 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 液压 HYDRAULIC POWER(111)