S 862-112
(72)
Set the flap handle to the 10 degree position and the speed brake lever to the UP position.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
29-00-00
ALL ú ú 01 Page 214 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 862-113
(73)
Remove power from hydraulic system B (AMM 29-15-00/201).
S 092-169
(74)
Disconnect the pressure line of the test bench from the standby pressure module at the self-seal disconnect.
S 092-170
(75)
Disconnect the drain hose from the standby reservoir.
S 432-116
(76)
Connect the pressure line of the standby EMDP at the self-seal disconnect.
S 432-171
(77)
Connect the supply line of the standby EMDP to the self-seal disconnect below the reservoir.
S 902-118
(78)
Replace these filter elements:
(a)
The return filters for the A and B hydraulic systems (AMM 29-15-61/201)
(b)
The case drain filters for the EDP's for the A and B hydraulic systems (AMM 29-15-91/201)
(c)
The case drain filters for the EMDP's for the A, B, and standby hydraulic systems (AMM 29-15-34/201)
(d)
The pressure filters for the EDP's and the EMDP's for the A and B hydraulic systems (AMM 29-15-71/201)
(e)
The pressure filter for the standby hydraulic system (AMM 29-15-81/201)
(f)
The pressure filter for the PTU (AMM 29-22-21/201).
CAUTION:_______ MAKE SURE THE DISCONNECT POPPET IS STRAIGHT BEFORE YOU
INSTALL THE HOSE HALF OF THE SELF-SEAL DISCONNECT. IF TOO MUCH
TORQUE IS NECESSARY TO DO THE INSTALLATION, DISCONNECT THE
SELF-SEAL DISCONNECT AND AGAIN MAKE SURE THE POPPET IS
STRAIGHT. AFTER THE INSTALLATION, MAKE SURE THE INDICATOR PINS
EXTEND A MINIMUM OF 0.06 INCH. IF THE INDICATOR PINS ARE NOT
CORRECTLY EXTENDED, FLUID FLOW WILL BE DECREASED OR STOPPED.
S 862-119
(79) Remove the DO-NOT-CLOSE tags and close these circuit breakers:
(a) P6 panel, 1) STBY HYD PUMP NORMAL 2) STBY HYD PUMP (ALT)
S 862-120
(80) Set the FLT CONTROL A or B switch on the P5 panel to the STDBY RUD position.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
29-00-00
ALL ú ú 01 Page 215 ú Jul 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 792-172
(81)
Examine the connections of the standby hydraulic system for leaks.
S 862-122
(82)
Set the FLT CONTROL switch on the P5 panel to the OFF position.
S 432-123
(83)
Connect the pressure lines, supply lines, and case drain lines to the EDP's for A and B hydraulic systems.
J. Examine the Hydraulic Systems for Leaks
S 612-124
(1)
Fill the reservoirs for the A and B hydraulic systems
(AMM 12-12-00/301).
S 862-125
(2)
Pressurize the reservoirs for the A and B hydraulic systems
(AMM 29-09-00/201).
S 862-173
WARNING: KEEP PERSONS AND EQUIPMENT AWAY FROM ALL CONTROL SURFACES AND
_______ THE NOSE GEAR WHEN HYDRAULIC POWER IS SUPPLIED. THE AILERONS, ELEVATORS, RUDDER, FLAPS, SLATS, SPOILERS, STABILIZER , AND THE NOSE GEAR ARE SUPPLIED WITH POWER BY THE HYDRAULIC SYSTEMS. INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR WHEN HYDRAULIC POWER IS SUPPLIED.
CAUTION: DO NOT OPERATE THE EMDP FOR MORE THAN TWO MINUTES IF THE NO. 1
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 液压 HYDRAULIC POWER(11)