• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 15:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 C.  Access
 (1)  Location Zone
 217 Main Wheel Well, RH

 D.  Procedure
 S 864-003
 (1)  
Release pressure from system A and B reservoirs (Ref 29-09-00/201).

 S 034-004

 (2)  
Disconnect the hydraulic lines at the fill selector.

 S 684-005

 (3)  
Drain hydraulic fluid into a container.

 S 164-006

 (4)  
Clean all hydraulic fluid from the installation area if it is necessary (Ref 12-40-00/201).

 S 434-007

 (5)  
Install plugs to the hydraulic lines.

 S 034-008

 (6)  
Remove the check valve, unions and O-rings from the fill selector ports.

 (7)  
Discard the O-rings.

 (8)  
Remove the fasteners.

 (9)  
Remove the fill selector valve.


 S 034-018
 S 034-009
 S 024-010
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-18-31
 ALL  ú ú 01 Page 401 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
FWD
RESERVOIR FILL
SELECTOR VALVE

SEE A
RESERVOIR FILL
SELECTOR VALVE

SEE B
RESERVOIR FILL 
FILTER MODULE 
RESERVOIR 
MANUAL 
FILL 
PUMP 

RESERVOIR FILL SELECTOR VALVE A
Reservoir Fill Selector Valve Installation
Figure 401 (Sheet 1)

PRESSURE FILL CONNECTION
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-18-31
 ALL  ú ú 01 Page 402 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL

RESERVOIR FILL SELECTOR VALVE


Reservoir Fill Selector Valve Installation
Figure 401 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-18-31
 ALL  ú ú 01 Page 403 ú Nov 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 TASK 29-18-31-404-001
 3.  Reservoir Fill Selector Valve Installation (Fig. 401)__________________________________________
 A. Consumable Materials
 (1)  
D00567 Skydrol Assembly Lube - MCS 352

 (2)  
D00568 Fluid - Hydraulic, BMS 3-11


 B. References
 (1)  
12-12-00/301, Hydraulic Reservoir

 (2)  
29-09-00/201, Hydraulic Reservoir Pressurization System


 C. Access
 (1)  Location Zone
 217 Main Wheel Well, RH

 D. Procedure
 S 424-011
 (1)  
Install the fill selector valve to the structure with the fasteners.

 S 644-012

 (2)  
Apply assembly lube or hydraulic fluid to the O-rings and the threads of the fittings.

 S 434-013

 (3)  
Install the check valve, unions and O-rings in the ports of the fill selector valve.

 (4)  
Install the tubing to the check valve and unions.

 (5)  
Pressurize the hydraulic reservoirs (Ref 29-09-00/201).

 (6)
Do the servicing of the hydraulic reservoirs (Ref 12-12-00/301).

 (7)  
Examine the fill selector valve for leaks.


 S 434-014
 S 864-015
 S 614-016
 S 794-017
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-18-31
 ALL  ú ú 01 Page 404 ú Mar 15/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 1.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 液压 HYDRAULIC POWER(132)