2......................…....................…..................................1
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
29-33-01
ALL ú ú 02 Page 103 ú Jul 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
HYDRAULIC FLUID QUANTITY INDICATOR REMOVAL/INSTALLATION
_______________________________________________________
1. General
_______
A. This procedure contains two tasks. The first task is to remove the hydraulic fluid quantity indicator. The second task is to install the hydraulic fluid quantity indicator.
B. The hydraulic fluid quantity indicators are found on the lower part of the P3-1 panel. The indicators are installed into the panel from the front and are held in position with clamps. There is an indicator for hydraulic system A and system B.
TASK 29-33-11-004-001
2. Hydraulic Fluid Quantity Indicator Removal
__________________________________________
A. Access
(1) Location Zone
101/102 Control Cabin
B. Procedure
S 864-002
(1) Open these circuit breakers and attach DO-NOT-CLOSE tags:
(a)
P6-2 Circuit Breaker Panel 1) For hydraulic system A indicator: a) SYS A HYD OIL QTY
2) For Hydraulic system B indicator: a) SYS B HYD OIL QTY
(b)
P42 Five Volt Lighting Panel
1) 5V AC SEC XFMR
S 024-013
(2) Loosen the adjustment screw for the indicator clamp.
NOTE: The clamp adjustment screw is the larger screw found to the
____
right of the indicator.
S 024-004
(3)
Pull the indicator out from the instrument panel to get access to the electrical connector.
(4)
Disconnect the electrical connector.
(5)
Remove the hydraulic fluid quantity indicator.
S 024-014
S 024-006
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
29-33-11
ALL ú ú 01 Page 401 ú Nov 12/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
TASK 29-33-11-404-007
3. Hydraulic Fluid Quantity Indicator Installation
_______________________________________________
A. References
(1)
AMM 24-22-00/201, Manual Control
(2)
AMM 29-09-00/201, Hydraulic Reservoir Pressurization System
B. Access
(1) Location Zone
101/102 Control Cabin
C. Procedure
S 424-009
(1)
Connect the electrical connector to the indicator.
S 424-019
(2)
Install the hydraulic fluid quantity indicator into the instrument panel.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 液压 HYDRAULIC POWER(158)