• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 19:15来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 494-009
 (6)  Put a cover on the modular package housing.
 TASK 27-09-41-404-038
 3. Spoiler Shutoff Valve Installation (Fig. 401)
__________________________________
 A. Consumable Materials
 (1)  
D00288 Lubricant, Skydrol Assembly - MCS 352

 (2)  
D00148 Fluid-Hydraulic, BMS 3-11, Type IV, Class 1

 B.
References

 (1)  
AMM 12-12-00/301, Hydraulic Reservoir

 (2)  
AMM 27-09-41/501, Spoiler Shutoff Valve

 (3)  
AMM 29-09-00/201, Hydraulic Reservoir Pressurization System

 C.
Access

 (1)  
Location Zone
 101, 102 Control Cabin
 216, 217 Main Wheel Well


 D.
Procedure


 S 424-042
 (1)  
Install the spoiler shutoff valve:

 (a)  
Apply the hydraulic fluid or the assembly lubricant to the five O-rings and the backup rings.

 (b)  
Install the five O-rings and the backup rings on the shutoff valve.

 (c)  
Put the shutoff valve in the hole in the modular package housing.

 (d)  
Install the four bolts.

 (e)  
Tighten the bolts to 30-40 pound-inches.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-09-41
 ALL  ú ú 02 Page 403 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (f)  Install the lockwire on the bolts.
 NOTE: Make sure the lockwire is installed from the low
____ pressure warning switch to a bolt for one of the two shutoff valves on the module.
 S 434-016
 (2)  
Connect the electrical connector to the shutoff valve.

 E.
Put the Airplane Back to Its Usual Condition


 S 864-017
 (1)
Remove the DO-NOT-CLOSE tags and close these circuit breakers:

 (a)  
P6-2 Panel
 1) SHUTOFF VALVES - SPOILER

 

 S 444-018
 (2)  
Do this task: "Put the Hydraulic Reservoir Back to Its Usual Condition" (AMM 29-09-00/201).

 S 724-020

 (3)  
Do this task: "Functional Test - Spoiler Shutoff Valves" (AMM 27-09-41/501).

 S 614-021

 (4)  
Do this task to service the hydraulic reservoirs: "Service Hydraulic Reservoir" (AMM 12-12-00/301).


 TASK 27-09-41-004-039
 4. Spoiler Shutoff Valve Motor Removal
___________________________________
 A. Access
 (1)  
Location Zone
 101, 102 Control Cabin
 216, 217 Main Wheel Well


 B.
Procedure


 S 864-023
 (1)  
Open these circuit breakers and attach DO-NOT-CLOSE tags:

 (a)  
P6-2 Panel
 1) SHUTOFF VALVES - SPOILER


 (2)  
Disconnect the electrical connector from the valve motor (Fig. 401).

 (3)
Put the manual override lever on the valve motor to POSITION 2.


 S 034-024
 S 984-025
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-09-41
 ALL  ú ú 01 Page 404 ú Nov 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 S 024-043
 (4)  
Remove the valve motor from the shutoff valve:

 (a)  
Remove the four screws that attach the valve motor to the shutoff valve.

 (b)  
Remove the valve motor from the shutoff valve.


 TASK 27-09-41-404-040
 5. Spoiler Shutoff Valve Motor Installation
________________________________________
 A. References
 (1)  
AMM 27-09-41/501, Spoiler Shutoff Valve

 B.
Access

 (1)  
Location Zone
 101, 102 Control Cabin
 216, 217 Main Wheel Well


 C.
Procedure


 S 984-029
 (1)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 1(32)